Title Page
-
Title
- iAuditor CVM Product Yard Checklist
-
Conducted on
-
Prepared by
-
Shift
-
Crew
-
Safety Focus
CV801 - CV811 - CV821 - CV831
-
Operational Checks - Inspect gear box oil level ok, no leaks/unusual smell/heat/vibration on drives and gearboxes, belt tracking, skirts not worn, rollers not collapsed/damaged, ploughs and scrapers operational, pulley lagging not worn, all guards secure, no belt damage, dust suppression sprays functioning, weightometers clear of build up
-
CV801
-
CV811
-
CV821
-
CV831
-
Housekeeping - Under pans clear of build up, remove built up material/tooling/rubbish, hoses rolled up, clean sump ensure sump pumps clear and operational, stairs/walkways clear.
-
Housekeeping
SK811 - SK812
-
Operational Checks - Inspect gear box oil level ok, no leaks/unusual smell/heat/vibration on drives and gearboxes, belt tracking, rollers not collapsed/damaged, ploughs and scrapers operational, pulley lagging not worn, all guards secure, no belt damage, skirts not worn, dust suppression sprays functioning, reelers free of kinks/twists/snags, hydraulic oil level, hydraulic oil leaks, rubber dampeners in place, water pressure good, stockpile management, grease levels
-
SK811
-
SK812
-
Housekeeping - Under pans clear of build up, remove built up material/tooling/rubbish, hoses rolled up, slew deck clear, stairs/walkways clear
-
Housekeeping
RC821
-
Operational Checks - Inspect gear box oil level ok, no leaks/unusual smell/heat/vibration on drives and gearboxes, belt tracking, rollers not collapsed/damaged, ploughs and scrapers operational, pulley lagging not worn, all guards secure, no belt damage, skirts not worn, dust suppression sprays functioning, reelers free of kinks/twists/snags, rubber dampeners in place, buckets not damaged, water pressure good, stockpile management, grease levels
-
RC821
-
Housekeeping - Walkways clear, remove built up material/rubbish/tooling, hoses rolled up, slew deck clear
-
Housekeeping
TLO
-
Operational Checks - No oil leaks, veneering operational/level sufficient, all guards secure, clean PE cells/instrumentation/cameras, skirts not worn, no excessive noise/smell/vibration, grease drum full, smooth operation of gates and chute.
-
TLO
-
Housekeeping - Remove built up material/rubbish/tooling, hoses rolled up, sump clear, batch gates free of build up,
-
Housekeeping