Audit
Instructions:
-------------------------------------
1. Answer each item accordingly.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Action click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link.
CUSTOMER NAME:
CUSTOMER CONTACT NUMBER:
CUSTOMER EMAIL ADDRESS:
BRIEF REASON FOR INSPECTION:
WHAT IS THE YEAR OF CONSTRUCTION?
WHAT IS THE PROPERTY TYPE?
WHAT IS THE CONSTRUCTION TYPE?
NUMBER OF STORIES?
HOW IS THE ACCESS TO THE PROPERTY?
WHAT WEATHER EXPOSURE ZONE IS THE PROPERTY LOCATED?
WHAT ARE THE WEATHER CONDITIONS ON THE DAY OF INSPECTION?
WHAT IS THE OUTSIDE TEMPERATURE ON THE DAY OF INSPECTION?
IS THE PROPERTY IN A SHELTERED POSITION?
WHAT ARE THE CONDITIONS OF THE EXTERNAL WALLS OF THE PROPERTY?
IF POOR, PLEASE EXPLAIN
HAS THERE BEEN ANY BUILDING ALTERATIONS, REPAIRS OR IMPROVEMENTS SINCE THE CAVITY WALL INSULATION HAS BEEN INSTALLED?
WHAT IS THE EXTERNAL FACADE FINISH OF THE FONT ELEVATION?
WHAT IS THE EXTERNAL FACADE FINISH OF THE REAR ELEVATION?
WHAT IS THE EXTERNAL FACADE FINISH OF THE RIGHTHAND SIDE ELEVATION?
WHAT IS THE EXTERNAL FAÇADE FINISH TO THE LEFTHAND SIDE ELEVATION?
WHAT IS THE EXTERNAL FACADE FINISH OF EXTENSION 1?
WHAT IS THE EXTERNAL FACADE FINISH OF EXTENSION 2?
WHAT ARE THE BUILDING FABRICS OF THE INTERNAL LEAF OF THE CAVITY WALL?
HAVE ALL ELEVATIONS OF THE PROPERTY BEEN INSULATED?
WHERE IS THE PROPERTIES VENTILATION COMING FROM?
WHAT IS THE TOTAL SQUARE METERAGE (M2) OF THE CAVITY AREA INSULATED?
WHAT IS THE WIDTH OF THE CAVITY BETWEEN THE OUTER AND INNER LEAF? (MM)
WHAT INSULATION PRODUCT HAS BEEN INSTALLED?
IS THE DRILL PATTERN CORRECT TO PRODUCT INSTALLED?
HAVE CAVITY BRUSHES BEEN INSTALLED?
IS THERE ANY EVIDENCE OF ANY VOIDS IN THE INSULATION?
ARE THERE ANY SIGNS OF RUBBLE/DEBRIS BRIDGING THE CAVITY WALL INNER AND OUTER LEAFS?
ARE THERE ANY SIGNS OF THE DPC BEING BREACHED?
ARE THERE ANY OBVIOUS SIGNS OF WATER PENETRATION DUE TO FAULTY CHIMNEY/ROOF/GUTTERING/DRAINPIPE ETC?
WHAT TYPE OF DPC IS PRESENT?
DOES THE PROPERTY HAVE FINLOCK GUTTERING?
WILL SCAFFOLDING BE REQUIRED?
WILL THE CAVITY WALL NEED TO BE RE-INSULATED WITH AN APPROVED PRODUCT?
EXTERNAL INSPECTION REPORT FINDINGS
PLEASE CONFIRM YOU ARE THE HOME OWNER
HOW LONG HAS THE OWNER / TENANT LIVED AT THE PROPERTY?
HAVE ANY OF THE RESIDENTS SUFFERED HEALTH ISSUE AS A DIRECT RESULT OF BLACK MOULD / DAMP?
HOW LONG HAS THE INSULATION BEEN INSTALLED?
IS THERE A CIGA GUARANTEE?
PLEASE PROVIDE THE NAME OF INSULATION INSTALL COMPANY.
WHAT IS CAUSING THE INTERNAL ISSUES?
DOES THE PROPERTY HAVE SUSPENDED FLOORS?
IF PARTIAL, WHAT AREA’S ARE SUSPENDED?
WHAT AREAS OF THE PROPERTY ARE AFFECTED BY DAMP ISSUES?
PLEASE PROVIDE PHOTOGRAPHIC EVIDENCE OF EACH AREA. PLEASE CLEARLY LABEL EACH PHOTOGRAPH. (CLICK "ADD AREA")
SPECIFY AREA:
(Click + icon to add another Area)
HAVE DAMP & AIR MOISTURE READINGS BEEN TAKEN?
SPECIFY AREA:
PROVIDE THE READINGS
(Click + icon to add another Area)
IS THE PROPERTY FULLY DOUBLE GLAZED?
WHAT YEAR WAS THE WINDOW GLAZING AND DOORS OF THE PROPERTY FITTED?
WHAT IS THE CONDITION OF GLAZING?
IS THERE ACCESS TO THE LOFT AREA?
IS THE LOFT AREA BOARDED?
CAN YOU IDENTIFY PROPERTY CONSTRUCTION FROM THE LOFT AREA?
TECHNICAL REPORT OVERVIEW
ADVISORY ACTIONS TO BE TAKEN: (CLICK "ADD ADVISORY ACTION")
DESCRIPTION
Extraction of cavity insulation
Replacement with an alternative insulated system
Market depreciation because of EWI
External repairs and associated remedial works required because of damage to the external System Build Construction
Internal repairs and redecorations
Total budget repair costs
ALL INFORMATION GATHERED TODAY FOR THIS INSPECTION REPORT IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE.