Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
RISK OBSERVATIONS
-
Are MTA conducted and documented
-
JSA
-
STOP WORKING AND PERFORM YOUR JHA
-
Permit
-
STOP WORKING AND GET YOUR PERMIT
-
Lockout / Tagout
-
CORRECTIVE ACTION
-
STOP WORKING AND PREFORM TAGOUT / LOCKOUT PROCEDURE
-
DATE AND TIME OF CORRECTION
-
DATE AND TIME OF CORRECTION
-
Confined Space Entry
-
DATE AND TIME OF CORRECTION
-
CORRECTIVE ACTION
-
DATE AND TIME OF CORRECTION
-
Scaffolds
-
DATE AND TIME OF CORRECTION
-
CORRECTIVE ACTION
-
DATE AND TIME OF CORRECTION
BODDY POSITION
-
Awkward Position / Static Postures
-
Safe pace not Rushing
-
STOP WORK AND PERFORM A TOOL BOX TALK
-
Stable Working Surface
-
DATE AND TIME OF CORRECTION
-
Recognize Need for Help
-
STOP WORK AND PERFORM TOOL BOX TALK
PERSONAL PROTECTIVE EQUIPMENT
-
Are hard hat worn for all coworkers?
-
CORRECTIVE ACTION
-
Are all coworkers wearing face and eye protection?
-
CORRECTIVE ACTION
-
Are coworkers wearing ears protection when needed?
-
CORRECTIVE ACTION
-
Are coworkers wearing respiratory protection when needed?
-
CORRECTIVE ACTION
-
Are coworkers wearing hand and arm protection?
-
CORRECTIVE ACTION
-
Are coworkers wearing legs and feet protection?
-
CORRECTIVE ACTION
-
Are coworkers using Fall Protection when needed?
-
CORRECTIVE ACTION
EQUIPMENTS / TOOLS
-
Are coworkers using the wright tool for the task on hand?
-
DATE AND TIME THAT THE WRIGHT TOOL WERE ISUED TO THE COWORKER
-
CORRECTIVE ACTION
-
DATE AND TIME OF CORRECTION
-
Is the tool used as designed?
-
STOP WORK AND TRAIN COWORKERS ON HOW TO USE THE TOOLS
-
Inspected / safe condition?
-
CORRECTIVE ACTION
-
Has the tool proper guards?
-
LOCKOUT / TAGOUT THE TOOL UNTIL PROPER GUARD IS IN PLACE
-
Are ladders secured top and bottom?
-
DATE AND TIME OF CORRECTION
-
Proper material handling
-
STOP WORK AND TRAIN COWORKERS ON MATERIAL HANDLING PROCEDURE
-
Material placement and storage
-
DATE AND TIME OF CORRECTION
-
CORRECTIVE ACTION
-
STOP WORK AND FIXT THE AREA add CORRECTIVE PICTURES
-
Are barricades in place?
-
DATE AND TIME OF CORRECTION
WORK ENVIROMENT
-
Is a good housekeeping observed?
-
DATE AND TIME OF CORRECTION
-
Are the excavations and protective system inspected?
-
REMOVE EVERY COWORKER FROM EXCAVATION AND HAVE THE INSPECTION DONE
-
CORRECTION CORRECTIVE ACTION
- Verbal Warning
- Written Warning
- Suspended
- Terminated
-
There is air contaminants in the area?
-
EVACUE THE AREA AND CALL IHI SAFETY
-
Are power lines secured and off the ground?
-
HAVE SOMEONE TO FIX IT
TRAINING
-
New hire
-
Site orientation
-
Crane Operator
-
Rigger
-
Competent Person
-
Truck operator