Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation - site administration
-
Method Statement signed and available?
-
Near misses, incidents and accidents have been correctly reported
-
Clearance certificate/s completed and closed out?
-
Accident book has been completed
-
Evidence of signing in and out of site daily?
Work area and Workmanship
-
Is installation work of a good standard?
-
Is the work area tidy and organised?
-
Is a suitable work area segregation system in use (barriers etc)?
-
Are all operatives wearing the correct PPE for the sites requirements?
Isolation and statutory signage
-
Are all relevant signs posted and situated appropriately where required?
-
Is the isolation sheet present and visible?
-
Is the 'Lock off, Tag out procedure being implemented?
Working at Height and confined space
-
MEWPs, Moblie Towers and Podiums - correctly assembled with guard rails, is Scaff Tag fitted and completed?
-
Use of ladders restricted? Are safer systems In use where applicable?
-
Confined Space - is there a safety harness? Is there a rescue plan? Do the operatives have a calibrated gas monitor?
Tool Box Talk
-
Tool box Talk
-
Signature of Engineer
-
Signature
-
Signature of engineer