Site Conducted
-
Inspection Date
-
S Reference
-
Communications Provider
-
Installation Partner
-
Region
-
Auditor Job Role
-
Location
-
CityFibre Holdings Ltd, 15 Bedford St, London, WC2E 9HE
-
Prepared by
FTTx Installation Inspection
-
Please select the engineer's name (If not listed, select other and provide the name in the notes)
-
Date Installation was Completed
-
Check in-progess or Retrospective
Secondary Node
-
Engineer accreditations available and in date (NRSWA, Smart awards - OR accreditations)
-
Risk assessment completed and highlighted risks to the task to be completed?
-
Correct PPE being worn for activity - including safety footwear, eye shields, gloves, Hi-viz jacket.
-
Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk
-
On arrival, no engineering waste left on-site at secondary node
-
Secondary node secure and defect free? (Including door seals)
-
No visible bare fibres from BFT's? Protective tubing installed over all fibres?
-
Fibre installed with no additional excess fibre when blown?
-
Fibre from BFT routed through cable management to allocated fibre port? No excessive bends in fibre causing potential damage and poor service - Tagged and labelled?
-
Fibre connector built to specification and connected securely in allocated fibre port?
-
No Engineering waste left in bottom of SN cabinet?
Toby to Customer
-
Correct PPE being worn for activity - including safety footwear, eye shields, gloves, Hi-viz jacket.
-
Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk
-
Bend radius of BFT in toby box to install specification? (13x the outside diameter of the BFT - 7mm = 91mm radius)
-
Visually, reinstatement to required standard? (If retrospective check) A. BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm B. BFT installed in tarmac / concrete / Mono block - reinstatement to required standard? (If in progress >100mm depth)
-
Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk
-
BFT feeding Wall box cleated to the wall? covered by 'Dolly boot' and capping to Wall box? (If required - On pathway, public access)
-
Wall box installed and secured 300mm above ground level as per installation specification?
-
Fibre blown to required safety and quality standards? - Cleaned, dart tested, correct pressure
-
Excess blown fibre and fibre patch lead coiled and secured to required standard in wall box?
-
Fibre patch lead installed and secured with 4mm clips to the required standard (Max 220mm horizontally apart and 150mm vertically apart) and entry hole sealed with chalk or silicone?
Customer
-
Correct PPE being worn for activity - Gloves, eye shields
-
Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk
-
LC/APC connector, connected and secured in the wall box to the required standard?
-
Fibre patch cable cleated and formed correctly to ONT location? (Including a grommet installed on entry hole?
-
Testing: Demonstrates readings to be with-in the required -15dBm to -25dBm @1310 - @1550
-
ONT fitted and secured to the wall? SC adaptor fitted / connected correctly?
-
A 'one click' cleaner used before connecting and fibre connector?
-
Services demonstrated to customer at end of completed install?
-
All engineering waste removed from site?
Secondary Node
-
On arrival, no engineering waste left on-site at secondary node
-
Secondary node secure and defect free? (Including door seals)
-
No visible bare fibres from BFTs? Protective tubing installed over all fibres?
-
Fibre installed with no additional excess fibre when blown?
-
Fibre from BFT routed through cable management to allocated fibre port?
-
No excessive bends in fibre causing potential damage and poor service
-
Tagged and labelled?
-
Fibre connected securely in allocated fibre port?
-
No Engineering waste left in bottom of SN cabinet?
Toby to Customer
-
Bend radius of BFT in toby box to install specification? (13x the outside diameter of the BFT - 7mm = 91m radius)
-
Visually, reinstatement to required standard? (If retrospective check) A. BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm B. BFT installed in tarmac / concrete - reinstatement to required standard? (If in progress >100mm depth)
-
Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk
-
BFT feeding Wall box cleated to the wall? covered by 'Dolly boot' and capping to Wall box? (If required - On pathway, public access)
-
Wall box installed and secured 300mm above ground level as per installation specification?
-
Excess blown fibre and fibre patch lead coiled and secured to required standard in wall box?
Customer
-
Fibre patch lead installed and secured with 5mm clips to the required standard (Max 220mm horizontally apart and 150mm vertically apart) and entry hole sealed with chalk or silicone?
-
LC/APC connector, connected and secured in the wall box to the required standard?
-
Fibre patch cable cleated and formed correctly to ONT location? (including a grommet installed on entry hole?
-
ONT fitted and secured to the wall? SC adaptor fitted / connected correctly?
-
All engineering waste removed from inside and outside the customer premises?
Sign off
-
Add signature