Onsite Audits

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Personnel Involved (including all present)

  • Housekeeping

  • 1.1 Are work areas free of clutter?

  • Press on hallway But Generally Tidy

  • 1.2 Are walkways free from obstructions?

  • 1.3 Are items stored so they are not at risk of falling and causing injury?

  • 1.4 Are areas clean, dry and free from slips & trip hazards. Warning signage displayed?

  • Personal Protective Equipment (PPE)

  • 2.1 Is min standard PPE worn where appropriate and is it clean and presentable?

  • 2.2 Is head protection worn, including chin strap in operational areas?

  • 2.3 Is eye / hearing protection, RPE and other specific PPE worn as per risk assessment?

  • Welfare

  • 3.1 Are facilities close to the work area and agreed with the client?

  • 3.2 Is hand cleaner, hand towels readily available?

  • Equipment including first aid

  • 4.1 Is equipment stored in correct position?

  • 4.2 Are first aid kits available, inspected and all items included?

  • 4.3 Are first aiders available on site / BREC trained staff within the team? Both Client + AC/MH

  • Electrical Equipment

  • 5.1 Are electrical appliances tested and in date with stickers applied?

  • 5.2 Are leads / cords kept clear of walkways? Before connection

  • 5.3 Are all electrical switchboards and isolators clearly identified?

  • 5.4 Where guards are being removed is the BREC Isolation procedures fully complied with?

  • Working at Height

  • 6.1 Has working at height been reviewed and at height work eliminated where possible? N/A

  • 6.2 MEWP operators certified / in date, Scaffolding erected by competent person / Tagged? WA

  • 6.3 Compliance with BREC MS and General RA? No exceptions unless job stopped N/A

  • 6.4 No access on top of conveyor unless in compliance with MS and RA controls? N/A

  • 6.5 Specific controls recorded on MS/RA and confirmed with office as acceptable? N/A

  • BREC Ltd Manager H&S Inspection and Audit Checklist

OHS Procedures / Documentation

  • Has the tablet system been fully completed with all involved sign on?

  • Permit to Work - available if required by client? in orrice

  • Risk Assessments and methods statement - specific for the task?

  • Lift plans - Specific plans in place for lifting requirements (belt lifting and press supporting)? HANSON Life Plan in Place

Plant & Equipment

  • Are guards fitted on all moving equipment for all activities?

  • Are all tools being used in the correct manner and for the function they were designed?

  • Are all emergency stops functioning as intended, including testing effectiveness?

  • Are hazards of vibration, noise, and dust / fumes controlled with specific RA in place?

  • Is the press positioned over a table with no falling risk?

Fire

  • Are fire hazards reviewed and eliminated during the task planning process?

  • Are fire extinguishers positioned close to any hot work activities?

  • Are fire exits and routes free from obstructions both inside and outside?

  • Are emergency evacuation and contract process know and agreed?

Lifting Operations

  • Have lifting operations been planned and assessed with specific lift plans in place?

  • Are slingers/banksmen involved in lifting operations trained HANSON 1ig Plaw

  • Are lifting accessories being used in the correct manner / as per MS for the task?

  • Are lifting accessories in good order, properly stored & within test?

(COSHH) Control of Substances Hazardous to Health

  • Are there any substances being used in the work area?

  • Are COSHH Assessments available for all items used?

  • Are items stored correctly and held in small in MW untillaging quantities

  • Is appropriate PPE being worn as per CoSHH assessment?

Safety Meeting / Safety Rep

  • Safety Committee meeting minutes / notes available to all staff?

  • Those involved in the visit acknowledge reading and questioning minutes / notes?

  • Last meeting actions progressing?

  • Other items observed Uncontrolled When Printed Page 2 of 3 Version Date: Oct 2021 V1

  • BREC Ltd Manager H&S Inspection and Audit Checklist

Hazard / Positive Observations

  • Number of Hazard Observed by the group during the inspection: -

  • none ones TiDy For site + Are

  • Comment on Safe (acts/condition) / Positive Ob's: -

  • Jois set up well with All Partias morning well

  • Comment on Un-Safe (acts/condition) / Ob's: -

  • Tocether Press PAT out g Date !

  • Ideas to improve H&S standards

  • Remove All leads in Places ON Completion

Question / Discussion Areas

  • Feedback/comments

  • Is BREC health and safety performance improving?

  • Score out of 10 (1 = definite no - 10 = strong yes)

  • 8

  • How are you / could you help to improve Health and safety?

  • How are / could we help to improve Health and Safety?

  • Any Other Comments

  • in General FeedBack ON sagety improvements is GOOD hits All Pactics importing in ranner + Feedisch

CONFIRMATION OF VISIT BY COMPLIANCE / HSE MANAGER COMPLETING INSPECTION

  • PRINT NAME

  • Sitemaz2

  • DATE:

  • SIGN NAME

  • 11/10/22

CONFIRMATION OF INSPECTION BY THE TEAM LEADER

  • PRINT NAME

  • NEIL COOPER

  • DATE:

  • SIGN NAME

  • 11/10/22

  • I confirm that the work area listed above has been inspected and actions have been identified to address any areas of non-conformance, ALL ACTIONS NEED TO BE ADDED TO H&S ACTION TRACKER Uncontrolled When Printed Page 3 of 3 Version Date: Oct 2021 V1

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.