Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Site set up
-
Is the Van well parked
-
Have Covid Precautions been observed where applicable
-
Is there adequate signage in use
-
Are the engineers using dust sheets and overshoes where needed
-
Has the customer been fully briefed on what to expect before works commence
Measure specific
-
What measure are you Auditing
- Solar PV
- Loft Insulation
- Under Floor insulation
- Boiler
- Boiler and Heating controls
-
What stage of the install are you attending
- Post install complete job
- Electrician's on site but panel install team have been
- Panel install in progress but pre Electricians arriving
- Panel and Electrical in progress
-
Are the panels installed neatly and symmetrically aligned within 70' of South
-
Please ask the customer what roof access method was used
-
Are the cables install and run in a manner to avoid chaffing and damage to the install
-
Within the loft can you see any bolts protruding through the felt ( this indicates a mounting hook that has been installed to a Latt instead of a joist)
-
Is the Check meter registering
-
Are All of the Safety stickers installed ( PV on roof, Caution Solar installed DC and AC isolator stickers
-
Is there a Red Isolator fitted to the AC
-
Is there a Black Isolator fitted to DC
-
Are the isolators easily accessible ( if in the loft are they accessible from the hatch or has walk boards been fitted)
-
Is the install installed within 70' of South
-
Please ask the customer what roof access method was used to access the roof
-
Are the brackets/Hooks secured to joists
-
Are All of the Safety stickers installed ( PV on roof, Caution Solar installed DC and AC isolator stickers
-
Is there a Black Isolator fitted to DC
-
Is there a Red Isolator fitted to the AC
-
Is the Check meter registering
-
Is the install installed within 70' of South
-
Is the install installed within 70' of South
-
Are the brackets/Hooks secured to joists
-
Are All of the Safety stickers installed ( PV on roof, Caution Solar installed DC and AC isolator stickers
-
Is there a Black Isolator fitted to DC
-
Is there a Red Isolator fitted to the AC
-
Is the Check meter registering
-
Has the insulation been cross-laid installed to a minimum of 270mmm
-
Are all High voltage cables uncovered ( electric shower, plug cables)
-
Are all downlights thermal capped and left in a safe manner
-
Has the hatch been insulated, including draft proofing
-
is there plenty of ventilation in the loft with no smell of damp
-
Has a wet rooms had a DMEV extractor fitted
-
have all living rooms had a trickle vent fitted to manufacturers specifications
-
Has a warning label been stapled in the loft
-
Is there a minimum of 15mm below the joists for airflow
-
has a damp meter reading been taken
-
is there adequate cross flow ventilation
-
Has a minimum of 150mm purpose made insulation been installed
-
Are all services left free, safe and insulated if required
-
has netting / securing system been installed to keep the insulation in situe
-
Has the whole possible are been insulated
-
have the boards been replaced securely and tidily
-
Has the boiler been installed securely
-
Is the flue free of obstruction and a minimum of 300mm from an openable window or door
-
Is the flue situated above 2000m from ground level
-
has a cage been fitted
-
is the pressure above 1.5 bar
-
has the white condensate pipe been insulated
-
is the boiler wired into a fused spur
-
Have heating controls been installed
-
are they functioning correctly
-
Do the towel radiator and hall radiator have thermostatic valves fitted
-
Are all installed Thermostatic valves in good condition with no visible leaks
Customer Satisfaction
-
Did the engineers treat your property with care
-
Did the engineers explain what had been installed and how to benefit from the measure
-
Are you satisfied with the works completed
-
What score out of 1 to 10 would you give your experience on the work completed (10 being excellent and 1 being very poor)