Title Page

  • Site conducted

  • Inspection Date

  • S Reference

  • Communications Provider

  • Installation Partner

  • Region

  • City

  • GPS Location
  • Prepared by

  • CityFibre Holdings Ltd, 15 Bedford St, London, WC2E 9HE

FTTx Installation Inspection

  • What region does the engineer mainly cover?

  • Please select the engineer's name (If not listed, select other and provide the name in the notes)

  • Please select the engineers name (if not listed, select other and provide the name in the notes)

  • Please select the engineers name (if not listed, select other and provide the name in the notes)

  • Please select the engineers name (if not listed, select other and provide the name in the notes)

  • Date Installation Was Completed

  • In Progress or Retrospective

Secondary Node (Mark all NA if direct feed from network)

  • Engineer accreditations available and in date (NRSWA, Smart awards - OR accreditations)

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • Correct PPE being worn for activity - including safety footwear, eye shields, gloves, Hi-viz jacket.

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • On arrival, no engineering waste left on-site at Secondary node?

  • Secondary node secure and defect free? (Including door seals)

  • No visible bare fibres from BFTs? Protective tubing installed over all fibres?

  • Fibre installed with no additional excess fibre when blown?

  • Fibre from BFT routed through cable management to allocated fibre port? No excessive bends in fibre causing potential damage and poor service - Tagged and labelled?

  • Fibre connected securely in allocated fibre port?

  • No Engineering waste left in bottom of SN cabinet?

Customer External

  • Correct PPE being worn for activity - including safety footwear, eye shields, gloves, Hi-viz jacket.

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • (MDU IOD - check NA if pre wire) Bend radius of BFT in toby box to install specification? (13x the outside diameter of the BFT - 7mm = 91mm radius)

  • (MDU IOD - check NA if pre wire) Visually, reinstatement to required standard? (If retrospective check) A. BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm B. BFT installed in tarmac / concrete / Mono block - reinstatement to required standard? (If in progress >100mm depth)

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • (MDU IOD - check NA if pre wire) Facade wall box installed 2.4m above ground level in suitable location to serve all properties

  • Cable locator used on area prior to drilling - available and defect free?

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • Drill available and defect free? Drilled at a 10 degree angle (Inside property to out)

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • At Customer premise, external entry point to property sealed with silicone or chalk?

  • 2 Fibre cable formed correctly on entry to the property? (Drip loop installed to prevent water ingress)

Customer Internal

  • Correct PPE being worn for activity - (Covid engineer policy - face mask, gloves) eye shields

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • Internal wall box fitted - secured and level?

  • Excess 2 fibre cable coiled and secured to the correct standard as per customer excellence manual?

  • Excess fibre patch cord coiled and formed to required standard as per customer excellence manual?

  • LC connector fitted and secure in internal wall box?

  • Fibre patch cord fixed and secured leading to ONT location?

  • ONT fixed and secure to wall?

  • Fibre patch lead connected and secure in ONT?

  • If check in progress, a 'one click' cleaner used before connecting and fibre connector?

  • Services demonstrated to customer at end of completed install?

  • All engineering waste cleared from site? (Internal)

  • While working inside property customer confirms blue overshoes worn?

  • Customer satisfied with service received?

Secondary Node (Mark all NA if direct feed from network)

  • On arrival, no engineering waste left on-site at Secondary node?

  • Secondary node secure and defect free? (Including door seals)

  • No visible bare fibres from BFTs? Protective tubing installed over all fibres?

  • Fibre installed with no additional excess fibre when blown?

  • Fibre from BFT routed through cable management to allocated fibre port? No excessive bends in fibre causing potential damage and poor service - Tagged and labelled?

  • Fibre connected securely in allocated fibre port?

  • No Engineering waste left in bottom of SN cabinet?

Customer External

  • (MDU IOD - check NA if pre wire) Bend radius of BFT in toby box to install specification? (13x the outside diameter of the BFT - 7mm = 91mm radius)

  • (MDU IOD - check NA if pre wire) Visually, reinstatement to required standard? (If retrospective check) A. BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm B. BFT installed in tarmac / concrete / Mono block - reinstatement to required standard? (If in progress >100mm depth)

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • (MDU IOD - check NA if pre wire) Facade wall box installed 2.4m above ground level in suitable location to serve all properties

  • At Customer premise, external entry point to property sealed with silicone or chalk?

  • 2 Fibre cable formed correctly on entry to the property? (Drip loop installed to prevent water ingress)

Customer Internal

  • Internal wall box fitted - secured and level?

  • Excess 2 fibre cable coiled and secured to the correct standard as per customer engineering manual?

  • Excess fibre patch cord coiled and formed to required standard as per customer excellence manual?

  • LC connector fitted and secure in internal wall box?

  • Fibre patch cord fixed and secured leading to ONT location?

  • ONT fixed and secure to wall?

  • Fibre patch lead connected and secure in ONT?

  • All engineering waste cleared from site? (Internal)

  • Customer satisfied with service received?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.