Title Page

  • Site conducted

undefined

  • CityFibre_Logo_JPG[1].jpg

Document Reference Number

  • OHSF-PR-08-02 Version 1 Revision 1 Dated 09/06/2021

  • (Format: City-PN-SN or ASN)

  • CityFibre Holdings Ltd, 15 Bedford St, London, WC2E 9HE

  • Audit Conducted on?

  • Prepared by

  • Date and Time

Location

  • Complete location on tracker
  • Is the Check in Progress or Retrospective?

Safety check - if you answer 'No' to the following question you must stop works and take appropriate action.

  • Are safe practices being carried out? (for members of the public, yourself and the engineers on-site)

Introduction

  • Do the engineers have I.D cards?

  • Engineer accreditations available and in date (NRSWA, SA002, Smart awards - OR accreditations)

  • Correct PPE being worn for activity - including safety footwear, eye protection, gloves, Hi-viz jacket (CF branded?).

  • Has site risk assessment been conducted and suitable for the current operations and are method statements in use and applicable? (COSHH)

  • Do the engineers have a copy of the Job Pack? (latest version)

Build stage

  • Block wiring

  • Internal or external

  • Internal wall box / D.P. fitted , secured and level?

  • All trunking used or fitted is secured with no fibre cable visible?

  • Have all fire regulations been met? (fire clips and fire stopping)

  • Civils

  • Blowing, splicing & testing

  • All aspects of external build are identical to original job pack ?

MDU Build - Pre wire

  • Is the Check in Progress or Retrospective?

  • What type of work are you auditing?

Traffic Management

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

Noticing and Competence

  • Are NRSWA Noticing / TTRO's in place and displayed?

  • Is the noticing valid for the current operations?

  • Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)

  • List Names of operatives sampled

  • Click ADD for another
  • Names of Operative

  • Qualification Expiry Date

Plant & Equipment

  • Cat, Genny, GDU, Excavator, other plant, tools and equipment

  • Is plant and equipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)

  • Equipment Name / Type

  • Calibration / Service due date

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Photographic Evidence

Fire

  • Are Fire Extinguishers held in vehicle or on site?

  • Is there an expiry date on the fire extinguisher? (Annual service record)

  • What is the expiry date of Fire Extinguishers?

  • Please provide photographic evidence

Welfare - For guidance see CDM Code of Practice Schedule 2

  • Are drinking water and vessels made available to the operatives?

  • Are washing facilities available (including warm water, sink, soap & hand towels)?

  • Are toilet facilities within a ten minutes walking distance?

  • Are site First Aiders Qualified?

  • What is the expiry date of first aid certificate?

  • Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Please provide photographic evidence

PPE

  • Please select PPE items that are; - Being used correctly and appropriately OR - Readily available

  • Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)

  • Is there suitable storage for PPE in the vehicles or welfare facility provided?

Defects

  • Are there any Defects / Issues that have not been rectified at the completion of Site Visit?

  • Follow standard defect process.

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm

  • Reinstatement / Civils route matches pack details as previously route approved by M/A?

  • External Distribution Box secured a minimum of 3m above ground level and is locked?

  • Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?

  • No visible signs of creepage on any drop cables in line of route?

  • 2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?

  • All aspects of external build are identical to original job pack ?

  • All engineering waste cleared from site?

  • Internal wall box / D.P. fitted , secured and level?

  • All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)

  • All trunking used or fitted is secured and no fibre cable visible?

  • Internal cupboards / Risers left to quality standard & locked after use.?

  • All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)

  • Loft hatches fitted where identified in job pack and secured accordingly.?

  • Patress boxes left at residents doorway and secured in termnation box. ?

  • Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?

  • All engineering waste cleared from site?

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

House Keeping

  • Please select any item which is true of the site being audited.

Plant & Equipment

  • Cat, Genny, GDU, Excavator, other plant, tools and equipment

  • Is plant and equipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)

  • Equipment Name / Type

  • Calibration / Service due date

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Photographic Evidence

Fire

  • Is there an expiry date on the fire extinguisher? (Annual service record)

  • What is the expiry date of Fire Extinguishers?

  • Please provide photographic evidence

Welfare - For guidance see CDM Code of Practice Schedule 2

  • Are drinking water and vessels made available to the operatives?

  • Are washing facilities available (including warm water, sink, soap & hand towels)?

  • Are toilet facilities within a ten minutes walking distance?

  • Are site First Aiders Qualified?

  • What is the expiry date of first aid certificate?

  • Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Please provide photographic evidence

PPE

  • Please select PPE items that are; - Being used correctly and appropriately OR - Readily available

  • Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)

  • Is there suitable storage for PPE in the vehicles or welfare facility provided?

Defects

  • Are there any Defects / Issues that have not been rectified at the completion of Site Visit?

  • Follow standard defect process.

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • All aspects of external build are identical to original job pack ?

  • Internal wall box / D.P. fitted , secured and level?

  • All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)

  • All trunking used or fitted is secured and no fibre cable visible?

  • Internal cupboards / Risers left to quality standard & locked after use.?

  • All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)

  • Loft hatches fitted where identified in job pack and secured accordingly.?

  • Patress boxes left at residents doorway and secured in termnation box. ?

  • Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?

  • All engineering waste cleared from site?

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

House Keeping

  • Please select any item which is true of the site being audited.

Plant & Equipment

  • Cat, Genny, GDU, Excavator, other plant, tools and equipment

  • Is plant and equipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)

  • Equipment Name / Type

  • Calibration / Service due date

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Photographic Evidence

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

Noticing and Competence

  • Are NRSWA Noticing / TTRO's in place and displayed?

  • Is the noticing valid for the current operations?

  • Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)

  • List Names of operatives sampled

  • Click ADD for another
  • Names of Operative

  • Qualification Expiry Date

Fire

  • Are Fire Extinguishers held in vehicle or on site?

  • Is there an expiry date on the fire extinguisher? (Annual service record)

  • What is the expiry date of Fire Extinguishers?

  • Please provide photographic evidence

Welfare - For guidance see CDM Code of Practice Schedule 2

  • Are drinking water and vessels made available to the operatives?

  • Are washing facilities available (including warm water, sink, soap & hand towels)?

  • Are toilet facilities within a ten minutes walking distance?

  • Are site First Aiders Qualified?

  • What is the expiry date of first aid certificate?

  • Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Please provide photographic evidence

PPE

  • Please select PPE items that are; - Being used correctly and appropriately OR - Readily available

  • Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)

  • Is there suitable storage for PPE in the vehicles or welfare facility provided?

Defects

  • Are there any Defects / Issues that have not been rectified at the completion of Site Visit?

  • Follow standard defect process.

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm

  • Reinstatement / Civils route matches pack details as previously route approved by M/A?

  • External Distribution Box secured a minimum of 3m above ground level and is locked?

  • Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?

  • No visible signs of creepage on any drop cables in line of route?

  • 2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?

  • All aspects of external build are identical to original job pack ?

  • All engineering waste cleared from site?

  • Internal wall box / D.P. fitted , secured and level?

  • All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)

  • All trunking used or fitted is secured and no fibre cable visible?

  • Internal cupboards / Risers left to quality standard & locked after use.?

  • All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)

  • Loft hatches fitted where identified in job pack and secured accordingly.?

  • Patress boxes left at residents doorway and secured in termnation box. ?

  • Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?

  • All engineering waste cleared from site?

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

Noticing and Competence

  • Are NRSWA Noticing / TTRO's in place and displayed?

  • Is the noticing valid for the current operations?

  • Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)

  • List Names of operatives sampled

  • Click ADD for another
  • Names of Operative

  • Qualification Expiry Date

House Keeping

  • Please select any item which is true of the site being audited.

Plant & Equipment

  • Cat, Genny, GDU, Excavator, other plant, tools and equipment

  • Is plant and equipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)

  • Equipment Name / Type

  • Calibration / Service due date

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Photographic Evidence

Fire

  • Are Fire Extinguishers held in vehicle or on site?

  • Is there an expiry date on the fire extinguisher? (Annual service record)

  • What is the expiry date of Fire Extinguishers?

  • Please provide photographic evidence

Welfare - For guidance see CDM Code of Practice Schedule 2

  • Are drinking water and vessels made available to the operatives?

  • Are washing facilities available (including warm water, sink, soap & hand towels)?

  • Are toilet facilities within a ten minutes walking distance?

  • Are site First Aiders Qualified?

  • What is the expiry date of first aid certificate?

  • Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Please provide photographic evidence

PPE

  • Please select PPE items that are; - Being used correctly and appropriately OR - Readily available

  • Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)

  • Is there suitable storage for PPE in the vehicles or welfare facility provided?

Defects

  • Are there any Defects / Issues that have not been rectified at the completion of Site Visit?

  • Follow standard defect process.

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm

  • Reinstatement / Civils route matches pack details as previously route approved by M/A?

  • External Distribution Box secured a minimum of 3m above ground level and is locked?

  • Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?

  • No visible signs of creepage on any drop cables in line of route?

  • 2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?

  • All aspects of external build are identical to original job pack ?

  • All engineering waste cleared from site?

Signing Lighting & Guarding

  • Are CityFibre approved Courtesy Boards displayed and contain correct information? (0800 083 6160 Number)

  • please provide supporting evidence such as annotated photo’s and notes

  • Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?

  • Are all chapter 8 elements in good condition (no damage)?

  • Please add pictures of damaged elements.

  • Is the lighting adequate for the works being carried out?

  • Is there temporary lighting (As in DRA)

Barriers and Work Area

  • Are Traffic / Pedestrian Segregation Barriers fitted, supported by suitable bases, linked together?

  • Is all the working equipment contained within the barriered work area?

  • Is the site closed (barriered / guarded) on all sides?

  • Is work area of a suitable size to operate safely?

Footways

  • Are alternative pedestrian arrangements required? (i.e. Pedestrian re-routing, narrowing of walkway, road crossing)

  • Are footway Covers / Ramps fitted, fixed and a correct loading for the task? (i.e. vehicle or pedestrian)

  • Are footway closed signs in use?

  • Are pedestrian diversion signs in place and correctly fitted? (is it immediately obvious what is happening and what is expected of me - pedestrians & traffic)

  • Is the pedestrian walkway the correct width? (At least 1.2m)

  • Is there a safe method for pedestrians to avoid the road / carriageway whilst passing works?

  • Please provide photographs of the walkway & signage.

  • (Footways / Paths) - Site Comments

Environmental

  • Is spoil stored and contained in appropriate, barriered off, area(s)? (Environmental considerations i.e. away from water courses, tree canopies & drainage, not covering a fire hydrant.)

  • Have all excavation works taken place as advised by the NJUG tree protection zone? SROH - NG1.10.1 <br>- Prohibited (no excavation) - within 1m of the tree trunk<br>- Precautionary (no mechanical excavation) - within 4x the circumference of the tree trunk<br>- Permitted (works as normal) - Outside of the precautionary zone

  • Is there a site appropriate spill kit available for any environmental issues, fuel leaks etc

Traffic Management

  • Is Traffic Management required?

  • Is Traffic Management suitable for location?

  • Is Traffic Management set up in accordance with plan and assessment?

  • Is traffic management equipment in good working condition? (ie traffic lights working)

  • Site Comments (Traffic Management)

Documentation / Welfare / PPE

Documentation

  • Has site risk assessment been conducted and suitable for the current operations?

  • Are method statements in use and applicable?

  • Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?

  • Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)

House Keeping

  • Please select any item which is true of the site being audited.

Plant & Equipment

  • Cat, Genny, GDU, Excavator, other plant, tools and equipment

  • Is plant and equipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)

  • Equipment Name / Type

  • Calibration / Service due date

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Photographic Evidence

  • Is it Internal or External

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm

  • Reinstatement / Civils route matches pack details as previously route approved by M/A?

  • External Distribution Box secured a minimum of 3m above ground level and is locked?

  • Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?

  • No visible signs of creepage on any drop cables in line of route?

  • 2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?

  • All aspects of external build are identical to original job pack ?

  • All engineering waste cleared from site?

Install Quality

  • Fibre installed with no additional excess fibre when blown?

  • Splice Tray Labelled neatly with all fibres in allocated spacers?

  • Pigtails labelled, secured and in parking bays ?

  • All fibre's and pigtails , where necessary,have been routed through cable management system ?

  • Secondary node secure and defect free, including no waste on SN cabinet floor?

  • Site left waste free and to quality standard ?

  • Correct connectors used in Toby box with BFT looped as per job specification.?

  • All aspects of external build are identical to original job pack ?

  • Internal wall box / D.P. fitted , secured and level?

  • All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)

  • All trunking used or fitted is secured and no fibre cable visible?

  • Internal cupboards / Risers left to quality standard & locked after use.?

  • All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)

  • Loft hatches fitted where identified in job pack and secured accordingly.?

  • Patress boxes left at residents doorway and secured in termnation box. ?

  • Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?

  • All engineering waste cleared from site?

Sign Off

  • Would you like to highlight any good practice?

  • Who would you like to highlight?

  • If answer is other, please specify.

  • Please name the group / individual you would like to highlight

  • Which category best describes the good practice? Categories TBC

  • Please describe the category of the work being recognised.

  • Please give a description of the practice you have observed and would like recognised.

  • Please provide the name of the Supervisor or Sub-Contractor.

  • Please provide the name of the Gang Leader.

  • Auditor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.