Title Page
-
Site conducted
undefined
Document Reference Number
-
OHSF-PR-08-02 Version 1 Revision 1 Dated 09/06/2021
-
(Format: City-PN-SN or ASN)
-
CityFibre Holdings Ltd, 15 Bedford St, London, WC2E 9HE
-
Audit Conducted on?
- SCCI
- Sitec
- Virtua
- CASS
- Kelly
- Entegro
- OCU
-
Prepared by
-
Date and Time
Location
-
Complete location on tracker
-
Is the Check in Progress or Retrospective?
Safety check - if you answer 'No' to the following question you must stop works and take appropriate action.
-
Are safe practices being carried out? (for members of the public, yourself and the engineers on-site)
Introduction
-
Do the engineers have I.D cards?
-
Engineer accreditations available and in date (NRSWA, SA002, Smart awards - OR accreditations)
-
Correct PPE being worn for activity - including safety footwear, eye protection, gloves, Hi-viz jacket (CF branded?).
-
Has site risk assessment been conducted and suitable for the current operations and are method statements in use and applicable? (COSHH)
-
Do the engineers have a copy of the Job Pack? (latest version)
Build stage
-
Block wiring
-
Internal or external
-
Internal wall box / D.P. fitted , secured and level?
-
All trunking used or fitted is secured with no fibre cable visible?
-
Have all fire regulations been met? (fire clips and fire stopping)
-
Civils
-
Blowing, splicing & testing
-
All aspects of external build are identical to original job pack ?
MDU Build - Pre wire
-
Is the Check in Progress or Retrospective?
-
What type of work are you auditing?
Traffic Management
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
Noticing and Competence
-
Are NRSWA Noticing / TTRO's in place and displayed?
-
Is the noticing valid for the current operations?
-
Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)
-
List Names of operatives sampled
Click ADD for another
-
Names of Operative
-
Qualification Expiry Date
Plant & Equipment
-
Cat, Genny, GDU, Excavator, other plant, tools and equipment
-
Is plant and equipment required on site at time of audit?
-
Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)
-
Equipment Name / Type
-
Calibration / Service due date
Click Add for more
-
Equipment Name / Type
-
Calibration / Service due date
-
Photographic Evidence
Fire
-
Are Fire Extinguishers held in vehicle or on site?
-
Is there an expiry date on the fire extinguisher? (Annual service record)
-
What is the expiry date of Fire Extinguishers?
-
Please provide photographic evidence
Welfare - For guidance see CDM Code of Practice Schedule 2
-
Are drinking water and vessels made available to the operatives?
-
Are washing facilities available (including warm water, sink, soap & hand towels)?
-
Are toilet facilities within a ten minutes walking distance?
-
Are site First Aiders Qualified?
-
What is the expiry date of first aid certificate?
-
Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4
-
What is the expiry date of First Aid Stocks in First Aid Box
-
Please provide photographic evidence
PPE
-
Please select PPE items that are; - Being used correctly and appropriately OR - Readily available
-
Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)
-
Is there suitable storage for PPE in the vehicles or welfare facility provided?
Defects
-
Are there any Defects / Issues that have not been rectified at the completion of Site Visit?
-
Follow standard defect process.
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm
- Check OK
- Below Standard
- N/A
-
Reinstatement / Civils route matches pack details as previously route approved by M/A?
- Check OK
- Below Standard
- N/A
-
External Distribution Box secured a minimum of 3m above ground level and is locked?
- Check OK
- Below Standard
- N/A
-
Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?
- Check OK
- Below Standard
- N/A
-
No visible signs of creepage on any drop cables in line of route?
- Check OK
- Below Standard
- N/A
-
2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
-
Internal wall box / D.P. fitted , secured and level?
- Check OK
- Below Standard
- N/A
-
All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)
- Check OK
- Below Standard
- N/A
-
All trunking used or fitted is secured and no fibre cable visible?
- Check OK
- Below Standard
- N/A
-
Internal cupboards / Risers left to quality standard & locked after use.?
- Check OK
- Below Standard
- N/A
-
All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)
- Check OK
- Below Standard
- N/A
-
Loft hatches fitted where identified in job pack and secured accordingly.?
- Check OK
- Below Standard
- N/A
-
Patress boxes left at residents doorway and secured in termnation box. ?
- Check OK
- Below Standard
- N/A
-
Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
House Keeping
-
Please select any item which is true of the site being audited.
Plant & Equipment
-
Cat, Genny, GDU, Excavator, other plant, tools and equipment
-
Is plant and equipment required on site at time of audit?
-
Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)
-
Equipment Name / Type
-
Calibration / Service due date
Click Add for more
-
Equipment Name / Type
-
Calibration / Service due date
-
Photographic Evidence
Fire
-
Is there an expiry date on the fire extinguisher? (Annual service record)
-
What is the expiry date of Fire Extinguishers?
-
Please provide photographic evidence
Welfare - For guidance see CDM Code of Practice Schedule 2
-
Are drinking water and vessels made available to the operatives?
-
Are washing facilities available (including warm water, sink, soap & hand towels)?
-
Are toilet facilities within a ten minutes walking distance?
-
Are site First Aiders Qualified?
-
What is the expiry date of first aid certificate?
-
Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4
-
What is the expiry date of First Aid Stocks in First Aid Box
-
Please provide photographic evidence
PPE
-
Please select PPE items that are; - Being used correctly and appropriately OR - Readily available
-
Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)
-
Is there suitable storage for PPE in the vehicles or welfare facility provided?
Defects
-
Are there any Defects / Issues that have not been rectified at the completion of Site Visit?
-
Follow standard defect process.
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
Internal wall box / D.P. fitted , secured and level?
- Check OK
- Below Standard
- N/A
-
All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)
- Check OK
- Below Standard
- N/A
-
All trunking used or fitted is secured and no fibre cable visible?
- Check OK
- Below Standard
- N/A
-
Internal cupboards / Risers left to quality standard & locked after use.?
- Check OK
- Below Standard
- N/A
-
All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)
- Check OK
- Below Standard
- N/A
-
Loft hatches fitted where identified in job pack and secured accordingly.?
- Check OK
- Below Standard
- N/A
-
Patress boxes left at residents doorway and secured in termnation box. ?
- Check OK
- Below Standard
- N/A
-
Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
House Keeping
-
Please select any item which is true of the site being audited.
Plant & Equipment
-
Cat, Genny, GDU, Excavator, other plant, tools and equipment
-
Is plant and equipment required on site at time of audit?
-
Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)
-
Equipment Name / Type
-
Calibration / Service due date
Click Add for more
-
Equipment Name / Type
-
Calibration / Service due date
-
Photographic Evidence
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
Noticing and Competence
-
Are NRSWA Noticing / TTRO's in place and displayed?
-
Is the noticing valid for the current operations?
-
Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)
-
List Names of operatives sampled
Click ADD for another
-
Names of Operative
-
Qualification Expiry Date
Fire
-
Are Fire Extinguishers held in vehicle or on site?
-
Is there an expiry date on the fire extinguisher? (Annual service record)
-
What is the expiry date of Fire Extinguishers?
-
Please provide photographic evidence
Welfare - For guidance see CDM Code of Practice Schedule 2
-
Are drinking water and vessels made available to the operatives?
-
Are washing facilities available (including warm water, sink, soap & hand towels)?
-
Are toilet facilities within a ten minutes walking distance?
-
Are site First Aiders Qualified?
-
What is the expiry date of first aid certificate?
-
Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4
-
What is the expiry date of First Aid Stocks in First Aid Box
-
Please provide photographic evidence
PPE
-
Please select PPE items that are; - Being used correctly and appropriately OR - Readily available
-
Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)
-
Is there suitable storage for PPE in the vehicles or welfare facility provided?
Defects
-
Are there any Defects / Issues that have not been rectified at the completion of Site Visit?
-
Follow standard defect process.
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm
- Check OK
- Below Standard
- N/A
-
Reinstatement / Civils route matches pack details as previously route approved by M/A?
- Check OK
- Below Standard
- N/A
-
External Distribution Box secured a minimum of 3m above ground level and is locked?
- Check OK
- Below Standard
- N/A
-
Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?
- Check OK
- Below Standard
- N/A
-
No visible signs of creepage on any drop cables in line of route?
- Check OK
- Below Standard
- N/A
-
2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
-
Internal wall box / D.P. fitted , secured and level?
- Check OK
- Below Standard
- N/A
-
All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)
- Check OK
- Below Standard
- N/A
-
All trunking used or fitted is secured and no fibre cable visible?
- Check OK
- Below Standard
- N/A
-
Internal cupboards / Risers left to quality standard & locked after use.?
- Check OK
- Below Standard
- N/A
-
All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)
- Check OK
- Below Standard
- N/A
-
Loft hatches fitted where identified in job pack and secured accordingly.?
- Check OK
- Below Standard
- N/A
-
Patress boxes left at residents doorway and secured in termnation box. ?
- Check OK
- Below Standard
- N/A
-
Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
Noticing and Competence
-
Are NRSWA Noticing / TTRO's in place and displayed?
-
Is the noticing valid for the current operations?
-
Have Streetworks personnel got the relevant NRSWA Cards and plant certificates in date, appropriate and available for inspection? (Original / Print / Digital)
-
List Names of operatives sampled
Click ADD for another
-
Names of Operative
-
Qualification Expiry Date
House Keeping
-
Please select any item which is true of the site being audited.
Plant & Equipment
-
Cat, Genny, GDU, Excavator, other plant, tools and equipment
-
Is plant and equipment required on site at time of audit?
-
Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)
-
Equipment Name / Type
-
Calibration / Service due date
Click Add for more
-
Equipment Name / Type
-
Calibration / Service due date
-
Photographic Evidence
Fire
-
Are Fire Extinguishers held in vehicle or on site?
-
Is there an expiry date on the fire extinguisher? (Annual service record)
-
What is the expiry date of Fire Extinguishers?
-
Please provide photographic evidence
Welfare - For guidance see CDM Code of Practice Schedule 2
-
Are drinking water and vessels made available to the operatives?
-
Are washing facilities available (including warm water, sink, soap & hand towels)?
-
Are toilet facilities within a ten minutes walking distance?
-
Are site First Aiders Qualified?
-
What is the expiry date of first aid certificate?
-
Is First Aid Kit stocked suitably for the work being carried out and content in date? For guidance see INDG214, Q4
-
What is the expiry date of First Aid Stocks in First Aid Box
-
Please provide photographic evidence
PPE
-
Please select PPE items that are; - Being used correctly and appropriately OR - Readily available
-
Is the CityFibre logo on the contractors PPE? (N/A- if flame retardant PPE is required)
-
Is there suitable storage for PPE in the vehicles or welfare facility provided?
Defects
-
Are there any Defects / Issues that have not been rectified at the completion of Site Visit?
-
Follow standard defect process.
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm
- Check OK
- Below Standard
- N/A
-
Reinstatement / Civils route matches pack details as previously route approved by M/A?
- Check OK
- Below Standard
- N/A
-
External Distribution Box secured a minimum of 3m above ground level and is locked?
- Check OK
- Below Standard
- N/A
-
Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?
- Check OK
- Below Standard
- N/A
-
No visible signs of creepage on any drop cables in line of route?
- Check OK
- Below Standard
- N/A
-
2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Signing Lighting & Guarding
-
Are CityFibre approved Courtesy Boards displayed and contain correct information? (0800 083 6160 Number)
-
please provide supporting evidence such as annotated photo’s and notes
-
Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?
-
Are all chapter 8 elements in good condition (no damage)?
-
Please add pictures of damaged elements.
-
Is the lighting adequate for the works being carried out?
-
Is there temporary lighting (As in DRA)
Barriers and Work Area
-
Are Traffic / Pedestrian Segregation Barriers fitted, supported by suitable bases, linked together?
-
Is all the working equipment contained within the barriered work area?
-
Is the site closed (barriered / guarded) on all sides?
-
Is work area of a suitable size to operate safely?
Footways
-
Are alternative pedestrian arrangements required? (i.e. Pedestrian re-routing, narrowing of walkway, road crossing)
-
Are footway Covers / Ramps fitted, fixed and a correct loading for the task? (i.e. vehicle or pedestrian)
-
Are footway closed signs in use?
-
Are pedestrian diversion signs in place and correctly fitted? (is it immediately obvious what is happening and what is expected of me - pedestrians & traffic)
-
Is the pedestrian walkway the correct width? (At least 1.2m)
-
Is there a safe method for pedestrians to avoid the road / carriageway whilst passing works?
-
Please provide photographs of the walkway & signage.
-
(Footways / Paths) - Site Comments
Environmental
-
Is spoil stored and contained in appropriate, barriered off, area(s)? (Environmental considerations i.e. away from water courses, tree canopies & drainage, not covering a fire hydrant.)
-
Have all excavation works taken place as advised by the NJUG tree protection zone? SROH - NG1.10.1 <br>- Prohibited (no excavation) - within 1m of the tree trunk<br>- Precautionary (no mechanical excavation) - within 4x the circumference of the tree trunk<br>- Permitted (works as normal) - Outside of the precautionary zone
-
Is there a site appropriate spill kit available for any environmental issues, fuel leaks etc
Traffic Management
-
Is Traffic Management required?
-
Is Traffic Management suitable for location?
-
Is Traffic Management set up in accordance with plan and assessment?
-
Is traffic management equipment in good working condition? (ie traffic lights working)
-
Site Comments (Traffic Management)
Documentation / Welfare / PPE
Documentation
-
Has site risk assessment been conducted and suitable for the current operations?
-
Are method statements in use and applicable?
-
Are COSHH Assessment and Safety Data Sheets available for all hazardous substances held on site?
-
Are utility drawings onsite, available, legible and in date? (ordinarily 28 days from date of issue)
House Keeping
-
Please select any item which is true of the site being audited.
Plant & Equipment
-
Cat, Genny, GDU, Excavator, other plant, tools and equipment
-
Is plant and equipment required on site at time of audit?
-
Are Plant / Equipment etc in good operational order, with beacons where required? (To include F91's)
-
Equipment Name / Type
-
Calibration / Service due date
Click Add for more
-
Equipment Name / Type
-
Calibration / Service due date
-
Photographic Evidence
-
Is it Internal or External
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
Visually, resinsatement to required standard? Pre-agreed & determned depths as stated in BOM A Distribution trench Width Min 80mm and 250mm surface cover B BFT in soft to the required depth? (expose cable) Grass = 200mm, flower bed = 250mm
- Check OK
- Below Standard
- N/A
-
Reinstatement / Civils route matches pack details as previously route approved by M/A?
- Check OK
- Below Standard
- N/A
-
External Distribution Box secured a minimum of 3m above ground level and is locked?
- Check OK
- Below Standard
- N/A
-
Catenary wire securely fitted to wall and all fibre drops cable tied accordingly?
- Check OK
- Below Standard
- N/A
-
No visible signs of creepage on any drop cables in line of route?
- Check OK
- Below Standard
- N/A
-
2F Drop cables looped at each premise and secured accordingly & to quality standard with all loops equal in size.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Install Quality
-
Fibre installed with no additional excess fibre when blown?
- Check OK
- Below Standard
- N/A
-
Splice Tray Labelled neatly with all fibres in allocated spacers?
- Check OK
- Below Standard
- N/A
-
Pigtails labelled, secured and in parking bays ?
- Check OK
- Below Standard
- N/A
-
All fibre's and pigtails , where necessary,have been routed through cable management system ?
- Check OK
- Below Standard
- N/A
-
Secondary node secure and defect free, including no waste on SN cabinet floor?
- Check OK
- Below Standard
- N/A
-
Site left waste free and to quality standard ?
- Check OK
- Below Standard
- N/A
-
Correct connectors used in Toby box with BFT looped as per job specification.?
- Check OK
- Below Standard
- N/A
-
All aspects of external build are identical to original job pack ?
- Check OK
- Below Standard
- N/A
-
Internal wall box / D.P. fitted , secured and level?
- Check OK
- Below Standard
- N/A
-
All trunking used is securely fitted and to a quality standard.? (Any previously damaged trunking to have been identified before work commenced.)
- Check OK
- Below Standard
- N/A
-
All trunking used or fitted is secured and no fibre cable visible?
- Check OK
- Below Standard
- N/A
-
Internal cupboards / Risers left to quality standard & locked after use.?
- Check OK
- Below Standard
- N/A
-
All ceiling tiles in line of route have been correctly re-fitted with no damage caused? (Previously damaged tiles need to have been identified before work commenced)
- Check OK
- Below Standard
- N/A
-
Loft hatches fitted where identified in job pack and secured accordingly.?
- Check OK
- Below Standard
- N/A
-
Patress boxes left at residents doorway and secured in termnation box. ?
- Check OK
- Below Standard
- N/A
-
Where 2F cable has been left above ceiling tile / hatch , fire clips used and 2F has been looped to correct standard.?
- Check OK
- Below Standard
- N/A
-
All engineering waste cleared from site?
- Check OK
- Below Standard
- N/A
Sign Off
-
Would you like to highlight any good practice?
-
Who would you like to highlight?
-
If answer is other, please specify.
-
Please name the group / individual you would like to highlight
-
Which category best describes the good practice? Categories TBC
-
Please describe the category of the work being recognised.
-
Please give a description of the practice you have observed and would like recognised.
-
Please provide the name of the Supervisor or Sub-Contractor.
-
Please provide the name of the Gang Leader.
-
Auditor Signature