Title Page
-
Site conducted
-
Inspection Date
-
S Reference
-
Communications Provider
- Vodafone
- TalkTalk
- Zen Internet
- Highnet
- Giganet
- AirBroadband
- Triangle
- Quickline
- Pure
- Digital home
- Giganet
-
Installation Partner
-
Region
-
City
-
GPS Location
-
CityFibre Holdings Ltd, 15 Bedford St, London, WC2E 9HE
-
What region does the engineer mainly cover?
-
Please select the engineers name (if not listed, select other and provide the name in the notes)
-
Please select the engineers name (if not listed, select other and provide the name in the notes)
-
Please select the engineers name (if not listed, select other and provide the name in the notes)
-
Please select the engineers name (if not listed, select other and provide the name in the notes)
-
Date Installation was completed
-
Check In progress or Retrospective
Secondary Node
-
Correct PPE being worn for activity - including safety footwear, eye sheilds, gloves, Hi-viz jacket.
-
Risk assessment completed and highlighted risks to the task to be completed?
-
On arrival, no engineering waste left on-site at secondary node
-
Secondary node secure and defect free? (including door seals)
-
No visable bare fibres from BFT's? Protective tubing installed over all fibres?
-
Fibre installed with no additional excess fibre when blown?
-
Fibre from BFT routed through cable management to allocated fibre port? No excessive bends in fibre causing potential damage and poor service - Tagged and labeled?
-
If check in progess a 'one click' cleaner used before connecting any fibre connector?
-
Testing: Demonstrates readings to be with-in the required -15dBm to -25dBm @1310 - @1550
-
Fibre connected securely in allocated fibre port?
-
No Engineering waste left in bottom of SN cabinet?
DPA
-
Correct PPE being worn for activity - including safety footwear, eye sheilds, gloves, Hi-viz jacket.
-
Working area guarded off ensuring own, customer and public safety
-
Box key No5, roll bar and GDU available and defect free?
-
Correct method used for removing joint box lid (Including required steps for gas testing through process)
-
BFT in OR chamber connected with 7mm coupler to gel wrap, Bend radius of BFT to install specification? (13x the outside diameter of the BFT - 7mm = 91mm radius)
-
Joint box cover replaced using the reversed method for removal? Joint box lid flush and no additional hazards created?
-
Capping covering OR duct at property removed and replaced causing no damage or defects while installing BFT?
-
BFT feeding Wall box cleated to the wall? covered by 'Dolly boot' and capping to Wall box? (If required - On pathway, public access) 300mm away from OR external box?
-
Wall box installed and secured 300mm above ground level as per installation specification?
-
Fibre blown to required safety and quality standards? - Cleaned, dart tested, correct pressure
-
Excess blown fibre and fibre patch lead coiled and secured to required standard in wall box?
-
Fibre patch lead installed and secured with 4mm clips to the required standard (Max 220mm horizontally apart and 150mm vertically apart) and entry hole sealed with chalk or silicone?
Customer Internal
-
Correct PPE being worn for activity - (Covid engineer policy - face mask, gloves) eye sheilds including blue overshoes when inside the property?
-
Internal fibre patch cable cleated and formed correctly to ONT location? (including a gromet installed on entry hole?
-
Testing: Demonstrates readings to be with-in the required -15dBm to -25dBm @1310 - @1550
-
ONT fitted and secured to the wall? SC adaptor fitted / connected correctly?
-
If check in progess a 'one click' cleaner used before connecting any fibre connector?
-
Services demonstrated to customer at end of completed install? (If in progress)
-
All engineering waste removed from site?
Secondary Node
-
On arrival, no engineering waste left on-site at secondary node
-
Secondary node secure and defect free? (including door seals)
-
No visable bare fibres from BFT's? Protective tubing installed over all fibres?
-
Fibre installed with no additional excess fibre when blown?
-
Fibre from BFT routed through cable management to allocated fibre port? No excessive bends in fibre causing potential damage and poor service - Tagged and labeled?
-
Fibre connected securely in allocated fibre port?
-
No Engineering waste left in bottom of SN cabinet?
DPA
-
BFT in OR chamber connected with 7mm coupler, Bend radius of BFT to install specification? (13x the outside diameter of the BFT - 7mm = 91mm radius)
-
Capping covering OR duct at property removed and replaced causing no damage or defects while installing BFT?
-
BFT feeding Wall box cleated to the wall? covered by 'Dolly boot' and capping to Wall box? (If required - On pathway, public access) 300mm away from OR external box?
-
Wall box installed and secured 300mm above ground level as per installation specification?
-
Excess blown fibre and fibre patch lead coiled and secured to required standard in wall box?
-
Fibre patch lead installed and secured with 4mm clips to the required standard (Max 220mm horizontally apart and 150mm vertically apart) and entry hole sealed with chalk or silicone?
Customer Internal
-
Internal fibre patch cable cleated and formed correctly to ONT location? (including a gromet installed on entry hole?
-
ONT fitted and secured to the wall? SC adaptor fitted / connected correctly?
-
All engineering waste removed from site?