Information

  • Audit Title

  • Inspection Document Reference

  • Client / Site

  • Start Time

  • Inspection Completed By

Information

  • The daily plant inspection is to be carried out by the site engineer. (Yes = Checked OK, No = Fault)
    All critical/urgent issues must be reported immediately to the site supervisor, or the site facilities management where appropriate. Add notes and photos to each section where there is issues found.

South Vent Room (B/037)

  • Colt Vent Panel

  • South Retail Extract Fans

  • South Basement Extract Fans

  • South Retail Extract VSD's

  • Power And Control Panels

  • Plant Room Lighting

  • Other - Plant Room General Check

Retail & Office Boiler Room (B/034)

  • CSP RET 2.1 Pump

  • CSP RET 2.2 Pump

  • CSP RET 4.1 Pump

  • CSP RET 4.2 Pump

  • CSP RET 4.3 Pump

  • CSP RET 1.1 Pump

  • CSP RET 1.2 Pump

  • CSP RET 1.3 Pump

  • Retail CS RET 5 Boiler Pump

  • Retail CS RET 6 Boiler Pump

  • Retail CS RET 7 Boiler Pump

  • CSP RET 3.1 Pump

  • CSP RET 3.2 Pump

  • CSP RET 3.3 Pump

  • Retail LTHW Pressurisation Unit PRU 1

  • PRU 1 Pressure Reading

  • PRU 1 Meter Reading

  • Retail LTHW Boilers <br>(1.1, 1.2, 2.1, 2.2, 2.3, 3.1, 3.2)

  • Condense Loop Pressurisation Unit PRU 2

  • PRU 2 Pressure Reading

  • PRU 2 Meter Reading

  • Office LTHWP OFF 1 Boiler Pump

  • Office LTHWP OFF 2 Boiler Pump

  • Office LTHWP OFF 3 Boiler Pump

  • Office LTHWP OFF 4 Boiler Pump

  • Office LTHWP OFF 5 Boiler Pump

  • Office LTHW Pressurisation Unit PRU LTHW 1

  • PRU LTHW 1 Pressure Reading

  • PRU LTHW 1 Meter Reading

  • Office LTHW Boilers <br>(1.1, 1.2, 2.1, 2.2, 3.1, 3.2, 4.1, 4.2)

  • Office LTHWP 6.1 Pump

  • Office LTHWP 6.2 Pump

  • Office LTHWP 5.1 Pump

  • Office LTHWP 5.2 Pump

  • Office LTHWP 7.1 Pump

  • Office LTHWP 7.2 Pump

  • Retail Water Heater RET WH01

  • Retail Water Heater RET WH02

  • Office Water Heater RET WH01

  • Office Water Heater RET WH02

  • Hydrotec Water Conditioner 1&2

  • Power And Control Panels

  • Plant Room Lighting

  • Other - Plant Room General Check

South VSD Plant Room (B/094)

  • South Retail Extract VSD's

  • South Basement Extract VSD's

  • Power And Control Panels

  • Air Conditioner Units DX01 and DX02

  • Plant Room Lighting

  • Other - Plant Room General Check

East Vent Plant Room (B/032)

  • Sump Pumps SP008 and SP009

  • Colt Vent Panel

  • Power And Control Panels

  • North Basement Supply AHU

  • South Basement Supply AHU

  • Motorcycle Park Supply AHU

  • Motorcycle Park Extract AHU

  • Plant Room Lighting

  • Other - Plant Room General Check

Office MER Room (B/033)

  • Denco A/C Unit 1

  • Denco A/C Unit 4

  • Pelco CCTV Hard Drives

  • Room Temperature

  • Equipment Room Lighting

  • Other - Equipment Room General Check

Retail MER Room (B/029)

  • Denco A/C Unit 2

  • Denco A/C Unit 3

  • Room Temperature

  • Pelco CCTV Hard Drives

  • Gas Suppression System

  • Equipment Room Lighting

  • Other - Equipment Room General Check

Cold Water Storage Plant Room (B/022)

  • Power And Control Panels

  • Retail Cold Water Storage Tank TK1

  • TK1 Ultraviolet Unit UV1

  • TK1 Packaged Booster Set BP1

  • Booster Set BP1 Pressure Reading

  • Office Cold Water Storage Tank TK2

  • TK2 Ultraviolet Unit UV4

  • TK2 Packaged Booster Set BP2

  • Booster Set BP2 Pressure Reading

  • Rainwater Harvest Cold Water Storage Tank TK3

  • TK3 Ultraviolet Unit UV3

  • TK3 Packaged Booster Set BP3

  • Booster Set BP3 Pressure Reading

  • CAT 5 Cold Water Storage Tank TK4

  • TK4 Ultraviolet Unit UV2

  • TK4 Packaged Booster Set BP4

  • Booster Set BP4 Pressure Reading

  • Sprinkler Pumps 1&2

  • Plant Room Lighting

  • Other - Plant Room General Check

GSES Plant Room (B/021)

  • Heat Pump 1

  • Heat Pump 2

  • Heat Pump 3

  • Heat Pump 4

  • Heat Pump 5

  • Heat Pump 6

  • Heat Pump 7

  • Heat Pump 8

  • Heat Pump 9

  • Heat Pump 10

  • Heat Pump 11

  • Heat Pump 12

  • Heat Pump 13

  • GSES CHW Pressurisation Unit PUS CHW

  • PUS CHW Pressure Reading

  • PUS CHW Meter Reading

  • GSES Ground Loop Pressurisation Unit PUS

  • PUS Pressure Reading

  • PUS Meter Reading

  • GSES LTHW Pressurisation Unit PUS LTHW

  • PUS LTHW Pressure Reading

  • PUS LTHW Meter Reading

  • GSES Ground Loop Pump P01

  • GSES Ground Loop Pump P02

  • GSES Ground Loop Pump P03

  • GSES Ground Loop Pump P04

  • GSES CHW Pump P05

  • GSES CHW Pump P06

  • GSES CHW Pump P07

  • GSES CHW Pump P08

  • GSES LTHW Pump P09

  • GSES LTHW Pump P10

  • GSES LTHW Pump P11

  • GSES LTHW Pump P12

  • Office CHWP 9.1 Pump

  • Office CHWP 9.2 Pump

  • DAC CSP RET 8.1 Pump

  • DAC CSP RET 8.2 Pump

  • DAC CSP RET 8.3 Pump

  • DAC Pressurisation Unit PRU 3

  • DAC PRU 3 Pressure Reading

  • DAC PRU 3 Meter Reading

  • GSES Supply AHU B001

  • Sump Pumps SP003 and SP004

  • Plant Room Lighting

  • Other - Plant Room General Check

North Vent Plant Room (B/005)

  • Power And Control Panels

  • North Basement Extract Fans

  • North Retail Extract Fans

  • North Retail Extract VSD's

  • Sump Pumps SP002

  • Plant Room Lighting

  • Other - Plant Room General Check

North VSD Plant Room (B/093)

  • Power And Control Panels

  • North Basement Extract VSD's

  • Air Conditioner Units DX01 and DX02

  • Plant Room Lighting

  • Other - Plant Room General Check

EDF Plant Lobby (B/017)

  • Power And Control Panels

  • EDF B009 VSD's

  • EDF B010 VSD's

  • EDF B012 VSD's

  • EDF B013 Extract Fan

  • EDF B014 VSD's

  • Plant Lobby Lighting

  • Other - Plant Lobby General Check

EDF Plant Lobby (B/045)

  • Power And Control Panels

  • EDF B028 VSD's

  • EDF B039 VSD's

  • Plant Lobby Lighting

  • Other - Plant Lobby General Check

Generator Fuel Store (B/044)

  • Fuel Control Panel

  • Generator Fuel Store Extract B044

  • Store Room Lighting

  • Other - Store Room General Check

Fourth Floor Plant Roof

  • Power And Control Panels

  • Office Supply AHU 4

  • Office Extract AHU 4

  • Office WC 4 Extract

  • Office AHU 4 Run Around Pump

  • Office AHU 4 Humidifier

  • Other - Plant Roof General Check

Sixth Floor Plant Roof

  • Power And Control Panels

  • Office Supply AHU 1

  • Office Extract AHU 1

  • Office WC 1 Extract 1&2

  • Office AHU 1 Run Around Pump

  • Office AHU 1 Humidifiers 1&2

  • Office Supply AHU 2

  • Office Extract AHU 2

  • Office WC 2 Extract

  • Office AHU 2 Run Around Pump

  • Office AHU 2 Humidifiers 1&2

  • Other - Plant Roof General Check

Chilled Water Pump Room Level 6

  • Power And Control Panels

  • Office CHWP OFF 6.1 Pump

  • Office CHWP OFF 6.2 Pump

  • Office CHWP OFF 6.3 Pump

  • Office CHWP OFF 7.1 Pump

  • Office CHWP OFF 7.2 Pump

  • Office CHWP OFF 7.3 Pump

  • Office CHWP OFF 8.1 Pump

  • Office CHWP OFF 8.2 Pump

  • Office CHWP OFF 8.3 Pump

  • Office Chilled Water Pressurisation Unit CHW PRU 1

  • CHW PRU 1 Pressure Reading

  • CHW PRU 1 Meter Reading

  • Plant Room Lighting

  • Other - Plant Room General Check

Sixth Floor Mezzanine Plant Roof

  • Office Chiller 1

  • Office CHWP OFF 1 Pump

  • Office Chiller 2

  • Office CHWP OFF 2 Pump

  • Office Chiller 3

  • Office CHWP OFF 3 Pump

  • Office Chiller 4

  • Office CHWP OFF 4 Pump

  • Office Chiller 5

  • Office CHWP OFF 5 Pump

  • Dry Air Cooler 1

  • Dry Air Cooler 2

  • Dry Air Cooler 3

  • Dry Air Cooler 4

  • Dry Air Cooler 5

  • Dry Air Cooler 6

  • Dry Air Cooler 7

  • Dry Air Cooler 8

  • Office Supply AHU 3

  • Office Extract AHU 3

  • Office WC 3 Extract

  • Office AHU 3 Run Around Pump

  • Office AHU 3 Humidifiers 1&2

  • Other - Plant Roof General Check

Completion

  • Additional Notes

  • Completion Time

  • Engineers Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.