Page 1: Initial questions
-
Document number
-
Audit Title
-
Client/Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Event Phase Summary
-
Reference Material/Submitted Documentation
-
National Legislation
Inductions
-
All contractors identified prior to commencing duties on site
-
The number of inductions completed
-
Have all staff been granted entry to site.
-
All machinery operators have supplied confirmation of authorities
General Safety Equipment / PPE
-
Site signage in position
-
All staff have high vis clothing
-
Safety helmets are worn in necessary areas
-
All work areas a clearly marked to prevent unauthorised access
-
Site communications equipment operational
-
Trained first aid personnel on site
-
First aid equipment available
-
Sunscreen available on site
-
Water available on site
-
Amenities available and open for use to all staff
Site Access Control
-
Are all fences in position
-
Are all Barriers/Barricades in position
-
All vehicles are checked prior to entry to site
-
Security in position and monitoring access
-
All drivers notified of vehicle safety policy
-
All vehicles operated within safe procedures
-
All vehicles escorted by a spotter
Plant
-
Have operator qualifications been checked
-
Are safe speeds being maintained
-
Are vehicles warning systems operational
Manual Handling
-
Are manual handling techniques being correctly utilised
-
Are mechanical aids being utilised to mitigate manual handling risks
Construction and working at heights
-
Staff have been made aware of safe operating procedures
-
All staff are qualified and approved by crew boss
-
Do staff hold relevant qualifications
-
Have height specific risk assessments been reviewed
-
Harnesses are worn in conjunction with safe work procedures
-
Use of securing fall protection directly observed
-
Are drop zones being monitored
-
Is wind loading considered
-
Is structure secured to ballast weights
-
Is worksite free of slip and trip hazards
-
Are suspended items fitted with safety fastenings (chains or wire)
Tools
-
All tools in good, safe working order
-
All tools operated by authorised personnel only
-
Are tools being utilised for intended purpose
-
Are tools being managed in order not to create trip and slip hazards
Electrical Work
-
Is work conducted by qualified and licensed personnel
-
Has risk assessment for installation been reviewed
-
Are cable trays utilised
-
All electrical equipment has current tags
-
Are leads and cables in good condition
-
Have all large infrastructure items been earthed
-
Are RCD's being utilised
Chemical Usage
-
All chemicals on site have been reported to management
-
Necessary SDS information supplied
-
Is PPE being utilised as directed by SDS
Fire Protection
-
Are fire extinguishers placed at site
-
Are fire extinguishers serviceable
-
Are CO2 extinguishers placed at electrical installations
Damage Maintenance or Repairs required
-
Is there any Identified damage that requires attention
-
Do any Items require maintenance
General Information / Incidents
-
undefined
Corrective actions required
Comments
-
undefined
-
Safety Officer
-
Sign