Title Page
-
Site Address
-
Conducted on
-
Job Number
-
Contracts Manager
- Raymond Threlfal
- Glen Cunningham
- Steven Robertshaw
-
Site Supervisor
- Dave Medley
- Chris Thompson
- Lee Corrigan
- Rob Russell
- Dave Phelan
- Nicky Clarkson
- Dave Cross
- Martin Riby
- Eden Barnes
- John Haynes
- Nathan Drury
Daily Site Diary
SITE DIARY AND REGISTER
-
Arrived on Site
-
Operatives on Site
- Shaun Molyneux
- Patrick Sobiecki
- Aaron Price
- Matty Marriott
- Shaun Molyneux
- Danny Grundy
- Luke Raynor
- Nicky Clarkson
- Terry Misset
- David Cross
- Anthony Price
- James Levick
- James Carter
- Andy White
- Damon Robinson
- Stephen Marsdon
- Scott Brunt
- Josh Marriott
- Josh Milson
- Shane Bingham
- Craig West
- Elliott Barley
- Alex Proctor
- Callum Riby
- Danny Larvin
- Adam Biscomb
AM - SHIFT CHECKS AND SUPERVISORS SITE DIARY NOTES
-
DCU Checks Completed
-
Enclosure Checks Completed
-
Works being completed during the shift
- Site induction(s) -
- Site establishment (Site Fencing setup and compound erection) -
- Decontamination Unit Setup -
- Enclosure Erection (framing and sheeting) -
- Smoke Test Enclosure(s) -
- Pre-cleaning (vacuuming / wiping items prior to sheeting) -
- Asbestos Removal (as detailed in the site specific method statement) -
- Spray fibre Suppression (via Greco or Kill spray) -
- Injection of Asbestos via multi point injection machine (Sprayed Coating or Pipe Insulation) -
- Environmental clean of the enclosure(s) -
- Waste Removal (as detailed in site specific method statement) -
- Fine Cleaning work area (clean prior to the supervisors inspection of the work area) -
- Supervisors Inspection of the work area (prior to visual inspection) -
- Independent analytical Inspection of site prior to the visual (Stage 1 of the 4 Stage Clearance) -
- Independent analytical visual inspection of the enclosure(s) (Stage 2 of the 4 Stage clearance) -
- Independent analytical clearance Air test of the Enclosure(s) (Stage 3 of the 4 Stage clearance) -
- De-tenting the work area(s) (Removal of the enclosure materials) -
- Independent 4 Stage Clearance (Stage 4 of the 4 Stage Clearance) -
- Clear Site (Removal of the plant and equipment from site) -
- Other (Detail all other works on site in supervisor notes below) -
-
Shifts Notes
BREAK TIMES
-
Break Start Time
-
Break Finish Time
PM - SHIFT CHECKS AND SUPERVISORS SITE DIARY NOTES
-
Enclosure Checks Completed
-
DCU Checks Completed
-
Works being completed during the shift
- Site induction(s) -
- Site establishment (Site Fencing setup and compound erection) -
- Decontamination Unit Setup -
- Enclosure Erection (framing and sheeting) -
- Smoke Test Enclosure(s) -
- Pre-cleaning (vacuuming / wiping items prior to sheeting) -
- Asbestos Removal (as detailed in the site specific method statement) -
- Spray fibre Suppression (via Greco or Kill spray) -
- Injection of Asbestos via multi point injection machine (Sprayed Coating or Pipe Insulation) -
- Environmental clean of the enclosure(s) -
- Waste Removal (as detailed in site specific method statement) -
- Fine Cleaning work area (clean prior to the supervisors inspection of the work area) -
- Supervisors Inspection of the work area (prior to visual inspection) -
- Independent analytical Inspection of site prior to the visual (Stage 1 of the 4 Stage Clearance) -
- Independent analytical visual inspection of the enclosure(s) (Stage 2 of the 4 Stage clearance) -
- Independent analytical clearance Air test of the Enclosure(s) (Stage 3 of the 4 Stage clearance) -
- De-tenting the work area(s) (Removal of the enclosure materials) -
- Independent 4 Stage Clearance (Stage 4 of the 4 Stage Clearance) -
- Clear Site (Removal of the plant and equipment from site) -
- Other (Detail all other works on site in supervisor notes below) -
-
Shifts Notes
-
Finished on Site
DCU Check List
DCU Details
-
DCU Number
-
NPU - DOP Certificate Expiry Date
-
Gas Certificate Expiry Date
-
Electrical Certificate Expiry Date
DCU Checklist
-
Unit Clean throughout (Including Dirty end)
-
Earth Spike - Stored Safely
-
Ensure the Clearance Certificate from the last job is displayed in the clean end
-
Steps - are in good condition, not have any cracks in the welds or major rust deposits
-
Boiler Instructions in the Clean End
-
LPG and Boiler checked (Full Bottle of Gas and inspected for faults)
-
Adequate shower pressure and water temperature
-
Compartment heating Functioning
-
Gas certification in date and displayed in the clean end
-
Functioning battery chargers
-
Carbon Monoxide detector fitted and operational
-
Any damage or problems (note in supervisors comments)
-
Shower Clean and Soap/Gel/Disposable towels in place
-
NPU functioning and DOP test in date and displayed in the clean end
-
Doors are self closing - check after transport
-
Connected to power supply (state if self contained)
-
Connected to water supply (state if self contained)
-
Waste water connected to the drain or waste container
-
Supervisors Comments
Enclosure Checklist
ENCLOSURE
-
Enclosure Smoke Test Undertaken
-
Seals Checked and Ok - AM
-
Seals Checked and Ok - PM
-
Waste not being allowed to accumulate - AM
-
Waste not being allowed to accumulate - PM
-
CCTV installed and working ok - AM
-
CCTV installed and working ok - PM
-
Trailing Leads and trip hazards secured / minimised - AM
-
Trailing Leads and trip hazards secured / minimised - PM
Airlock & Baglock
-
Seals and Flaps checked and ok - AM
-
Seals and Flaps checked and ok - PM
-
Primary decontamination Vacuum Checked (with yellow hose) and working - AM
-
Primary decontamination Vacuum Checked (with yellow hose) and working - PM
-
Sponge, Water and Kill spray present for Primary Decontamination - PM
-
Sponge, Water and Kill spray present for Primary Decontamination - AM
RPE and PPE
-
Check for improper or Incorrect use or storage of RPE or PPE - AM
-
Check for improper or Incorrect use or storage of RPE or PPE - PM
TRANSIT / WASTE ROUTE
-
Marked with appropriate signage, clean and unobstructed - AM
-
Marked with appropriate signage, clean and unobstructed - PM
NEGATIVE PRESSURE UNIT(S)
-
NPU Pre - Filter Changed - AM
-
NPU Pre - Filter Changed - PM
-
Negative Pressure unit(s) Reading - AM
-
Negative Pressure unit(s) Reading - PM
Mobile Tower Platform Inspection
MOBILE TOWER SCAFFOLD INSPECTION
-
Name or the Inspector(s)
- Shaun Molyneux
- Patrick Sobiecki
- Aaron Price
- Matty Marriott
- Shaun Molyneux
- Danny Grundy
- Luke Raynor
- Nicky Clarkson
- Terry Misset
- David Cross
- Anthony Price
- James Levick
- James Carter
- Andy White
- Damon Robinson
- Stephen Marsdon
- Scott Brunt
- Josh Marriott
- Josh Milson
- Shane Bingham
- Craig West
- Elliott Barley
- Alex Proctor
- Callum Riby
- Danny Larvin
- Adam Biscomb
-
Is the access equipment detailed in the Method statement suitable
CHECKS TO BE COMPLETED
-
Is the Tower level
-
Are the brakes working on each of the castors
-
Is the tower correctly built with the correct brace pattern
-
Are there sufficient gaurd rails on the tower
-
Are the toe boards in place on the tower
-
Are the outrigger in place on the scaffolding (where possible)
-
Are there any damaged parts on the tower
-
Is the ground surface as level as practicable or if not has the area been boarded to maintain a level area
-
Was the tower erected by a trained and competent person
-
Has the tower been constructed at a safe distance from live electrical services (4 metres)
-
Are the platform doors facing outwards
-
Are all open ends caped
Confirmation of information provided
CONFIRMATION OF THE INFORMATION PROVIDED All the information provided on the document is correct and is a true reflection of the times arriving / leaving sites and the daily works completed on site
-
Supervisors Signature