Title Page

  • Site Address
  • Conducted on

  • Job Number

  • Contracts Manager

  • Site Supervisor

Daily Site Diary

SITE DIARY AND REGISTER

  • Arrived on Site

  • Operatives on Site

AM - SHIFT CHECKS AND SUPERVISORS SITE DIARY NOTES

  • DCU Checks Completed

  • Enclosure Checks Completed

  • Works being completed during the shift

  • Shifts Notes

BREAK TIMES

  • Break Start Time

  • Break Finish Time

PM - SHIFT CHECKS AND SUPERVISORS SITE DIARY NOTES

  • Enclosure Checks Completed

  • DCU Checks Completed

  • Works being completed during the shift

  • Shifts Notes

  • Finished on Site

DCU Check List

DCU Details

  • DCU Number

  • NPU - DOP Certificate Expiry Date

  • Gas Certificate Expiry Date

  • Electrical Certificate Expiry Date

DCU Checklist

  • Unit Clean throughout (Including Dirty end)

  • Earth Spike - Stored Safely

  • Ensure the Clearance Certificate from the last job is displayed in the clean end

  • Steps - are in good condition, not have any cracks in the welds or major rust deposits

  • Boiler Instructions in the Clean End

  • LPG and Boiler checked (Full Bottle of Gas and inspected for faults)

  • Adequate shower pressure and water temperature

  • Compartment heating Functioning

  • Gas certification in date and displayed in the clean end

  • Functioning battery chargers

  • Carbon Monoxide detector fitted and operational

  • Any damage or problems (note in supervisors comments)

  • Shower Clean and Soap/Gel/Disposable towels in place

  • NPU functioning and DOP test in date and displayed in the clean end

  • Doors are self closing - check after transport

  • Connected to power supply (state if self contained)

  • Connected to water supply (state if self contained)

  • Waste water connected to the drain or waste container

  • AM - NPU manometer readings (these must be taken)

  • PM - NPU manometer reading (must be taken)

  • Supervisors Comments

Enclosure Checklist

ENCLOSURE

  • Enclosure Smoke Test Undertaken

  • Seals Checked and Ok - AM

  • Seals Checked and Ok - PM

  • Waste not being allowed to accumulate - AM

  • Waste not being allowed to accumulate - PM

  • CCTV installed and working ok - AM

  • CCTV installed and working ok - PM

  • Trailing Leads and trip hazards secured / minimised - AM

  • Trailing Leads and trip hazards secured / minimised - PM

Airlock & Baglock

  • Seals and Flaps checked and ok - AM

  • Seals and Flaps checked and ok - PM

  • Primary decontamination Vacuum Checked (with yellow hose) and working - AM

  • Primary decontamination Vacuum Checked (with yellow hose) and working - PM

  • Sponge, Water and Kill spray present for Primary Decontamination - PM

  • Sponge, Water and Kill spray present for Primary Decontamination - AM

RPE and PPE

  • Check for improper or Incorrect use or storage of RPE or PPE - AM

  • Check for improper or Incorrect use or storage of RPE or PPE - PM

TRANSIT / WASTE ROUTE

  • Marked with appropriate signage, clean and unobstructed - AM

  • Marked with appropriate signage, clean and unobstructed - PM

NEGATIVE PRESSURE UNIT(S)

  • NPU Pre - Filter Changed - AM

  • NPU Pre - Filter Changed - PM

  • Negative Pressure unit(s) Reading - AM

  • Negative Pressure unit(s) Reading - PM

Mobile Tower Platform Inspection

MOBILE TOWER SCAFFOLD INSPECTION

  • Name or the Inspector(s)

  • Is the access equipment detailed in the Method statement suitable

  • Number of tower scaffold on site

CHECKS TO BE COMPLETED

  • Is the Tower level

  • Are the brakes working on each of the castors

  • Is the tower correctly built with the correct brace pattern

  • Are there sufficient gaurd rails on the tower

  • Are the toe boards in place on the tower

  • Are the outrigger in place on the scaffolding (where possible)

  • Are there any damaged parts on the tower

  • Is the ground surface as level as practicable or if not has the area been boarded to maintain a level area

  • Was the tower erected by a trained and competent person

  • Has the tower been constructed at a safe distance from live electrical services (4 metres)

  • Are the platform doors facing outwards

  • Are all open ends caped

Confirmation of information provided

CONFIRMATION OF THE INFORMATION PROVIDED All the information provided on the document is correct and is a true reflection of the times arriving / leaving sites and the daily works completed on site

  • Supervisors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.