Title Page
-
Site location
-
Day conducted
-
Prepared by
-
Gang ID number:
TO BE CHECKED BY COMPETENT PERSON
-
Is the relevant work stream manual on site?
-
Is the work area free from slip/trip hazards?
-
Has a daily check / visual inspection taken place on all plant to be used?
-
All SLG to code of practice? (Insert applicable C.O.P. page No)
-
One gang member holds the required NRSWA unit for the work activity?
-
Is all the relevant PPE to be used in good condition?
-
Are all control measures in place as per the generic based RAMS?
-
Is the material storage safe and the site security adequate?
-
Do operatives on site have the appropriate PPE?
-
Is an adequate safety zone in place for lifting operations?
-
Can the minimum separation to overhead power lines be maintained?
-
Is all lifting equipment certified and fit for purpose?
-
Are the GDU in calibration? Date:
-
Can the site be secured ? 360 guarded
-
Has a daily check / visual<br>inspection taken place on<br>all plant to be used?
-
Do operatives on site<br>have the appropriate<br>accreditation?
Lead engineer name
-
Add signature
Personal 1
-
Add signature
Personal 2
-
Add signature
Personal 3
-
Add signature
Additional information
-