Title Page

  • Site location
  • Day conducted

  • Prepared by

Staff on site:

  • 1

  • 2

  • 3

  • 4

  • 5

  • 6

TO BE CHECKED BY the Site Lead

  • Do you have the Documents you require?

  • Have you got the tools you require and have they been checked for defects before use?

  • Work at Height - have you got the correct certificated equipment that you require?

  • Do you have and are you wearing the correct PPE for the task?

  • Has a daily check / visual<br>inspection taken place on<br>all plant to be used?

  • Do operatives on site<br>have the appropriate<br>accreditation?

Are any of the below Hazards applicable to the site that have not already been considered with suitable controls in the task risk assessment?

  • Slips and trips

  • Underground Utilities and Services - if breaking ground have you got the service drawings and CAT / Genny scanned the area?

  • Overhead lines - Are there any overhead lines in the near vicinity of our works that could be struck by our plant / Equipment?

  • Dust / Fumes

  • Falls from height

  • Asbestos / Asbestos debris (from existing buildings)

  • Fire / Explosion

  • Sharps from drug use in the area

  • Vehicles and plant used by others

  • Poor Lighting

  • Adverse weather

  • Risks from the work of others

  • Fragile roofs or structurally unsound structures

  • Anything else?

Controls required for identified hazard above

  • 1

  • 2

  • 3

  • 4

  • 5

Safe to proceed?

  • Is it safe to proceed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.