Title Page

  • Project Number

  • Contract Number

  • Client

  • Client Representative

  • Contractor

  • Please provide details of Contractor

  • Contractor Representative

  • Conducted on

  • Prepared by

  • Location

1.0 Weather Conditions Today

  • Maximum Temperature (Degrees C)

  • Maximum Wind Speed (km/h)

  • Rainfall (mm)

  • Relative Humidity (%)

  • Was Todays Work Delayed or Affected by Weather?

  • Please describe

  • Estimated time Lost

2.0 Health, Safety and Environment (HSE

Please List your HSE Events for today

  • HSE-01 HSE Injuries, Incidents or Events

  • HSE-02 Near Miss

  • HSE-03 First Aid Treatment

  • HSE-04 Medical Treatment Injury (MTI)

  • HSE-05 Lost Time Incident (LTI)

  • HSE-06 Lost Days

  • HSE-07 Spill / Environmental Incidents

  • HSE-08 Permits

  • HSE-09 JHA's/JSA's/SWMS (New and Revisited)

  • HSE-10 Prestart / Toolbox Meetings

  • HSE-11 Inductions

  • HSE-12 Take 5 or Equivalent

  • HSE-13 Hazard Observations

  • HSE-14 Rainfall

3.0 Labour Report

List the Staff Employed on Site Today

  • Name

  • Role

  • Site

  • Hours

  • Do you need to add more staff

  • Name

  • Role

  • Site

  • Hours

  • Do you need to add more staff

  • Name

  • Role

  • Site

  • Hours

  • Do you need to add more staff

  • Name

  • Role

  • Site

  • Hours

  • Do you need to add more staff

  • Name

  • Role

  • Site

  • Hours

  • Do you need to add more staff

  • Name

  • Role

  • Site

  • Hours

4.0 Equipment Report

  • Which Site

  • Equipment ID or Registration Number

  • Equipment Description

  • Amount of Time Used (hours)

  • Do you wish to add another item of Equipment

  • Which Site

  • Equipment ID or Registration Number

  • Equipment Description

  • Amount of Time Used (hours)

  • Do you wish to add another item of Equipment

  • Which Site

  • Equipment ID or Registration Number

  • Equipment Description

  • Amount of Time Used (hours)

  • Do you wish to add another item of Equipment

  • Which Site

  • Equipment ID or Registration Number

  • Equipment Description

  • Amount of Time Used (hours)

  • Do you wish to add an other Equipment

5.0 Progress Report

  • Which site did the majority of activity occur today?

  • Please describe the work achieved

  • Please Estimate the Completion Level for your contracted Work Package at this site (%)

  • Please estimate the cubic meters of earth moved today

  • Did you Work at any other site today

  • Which Site was worked on today?

  • Please describe the work achieved

  • Please Estimate the Completion Level for your contracted Work Package at this site (%)

  • Please estimate the cubic meters of earth moved today

  • Did you Work at any other site today

  • Which Site was worked on today?

  • Please describe the work achieved

  • Please Estimate the Completion Level for your contracted Work Package at this site (%)

  • Please estimate the cubic meters of earth moved today

  • Did you Work at any other site today

  • Which Site was worked on today?

  • Please describe the work achieved

  • Please Estimate the Completion Level for your contracted Work Package at this site (%)

  • Please estimate the cubic meters of earth moved today

6.0 Activities

7.0 Areas of Concern

  • Do you have any areas of concern with completing the contracted work package

8.0 Events

  • Please describe any other events that may have affected you ability to complete the assigned work package within the agreed timeframe.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.