Site Info
-
Project Name
-
Date
-
Signature
-
Weather
Log Checklist
-
Was One Call System contacted?
-
Protective system
- Trench shield (box)
- Sloping
- Wood shoring
- Other
-
Purpose of trenching?
- Drainage
- Sewer
- Water
- Gas
- Other
-
Were visual soil tests Made?
-
If yes , what soil type?
-
Surface encumbrances?
-
If yes, what type?
-
Water conditions?
-
Hazardous atmosphere exists? (If yes, follow confined space entry procedures policy; complete confined space entry permit; monitor for toxic gas(es))
-
If trenching or excavation exposed to public vehicular traffic (exhaust emission) : (If yes, refer to confined space entry procedures; complete Confined Space Entry Permit; monitor for toxic gas(es))
-
Measurements of trench: (Length___Width___Depth___
-
Is ladder within 25 feet of all workers:
-
Is excavated material stored two feet or more from edge of excavation:
-
Are employees exposed to public vehicular traffic:
-
Are other utilities protected:
-
Are sewer or natural gas lines exposed:
-
Periodic Inspection:
-
Did employees receive training in excavating:
-
Corrective Actions and Remarks: