Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job Information
-
OSHA 300 forms complete and posted from February 1 - April 30
-
Team Huddles up to date and complete?
-
Daily stretches being completed by all crews?
-
Emergency phone numbers posted?
-
OSHA and DOL posters posted?
-
"Safety Time-Outs" performed?
-
Work areas properly signed and barricaded?
-
Safety Data Sheets filed and accessible?
-
First-aid kit fully stocked with non-expired medicine?
-
Traffic control zones set up properly and maintained?
-
Corrective Action:
Housekeeping
-
Work areas neat?<br>
-
Projecting nails and screws bent over or removed?
-
Waste containers provided and being used?
-
Containers clearly labeled?
-
Passageways and walkways clear?
-
Corrective Action:
Fire Prevention
-
Adequate fire extinguishers , checked and accessible?
-
"No smoking"signs posted and enforced near flammables?
-
Corrective Action:
Electrical
-
Extension cords with bare wires or missing ground plugs taken out of service?
-
Ground fault circuit interrupters being used?
-
Temporary lighting where needed and compliant?
-
Terminal boxes equipped with required covers?
-
Corrective Action:
Hand,Power & Powder Actuated Tools
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Correct tool being used for the job at hand?
-
Operators of powder actuated tools trained?
-
Corrective Action:
Fall Protection
-
Safety rails and cables secured properly?
-
Safety harness worn properly?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
-
Corrective Action:
Ladders
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping,sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open postion?
-
No step at top two rungs of stepladder?
-
Corrective Action:
Scaffolding
-
All scaffold inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails,intermediate rails, toe boards and screens in place?
-
Planking sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
-
Corrective Action:
Floor & Wall Openings
-
All floor opening(s) planked over and labeled "hole" or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
-
Corrective Action:
Trenches,Excavation & Shoring
-
Compentent person identified and present?
-
Excavation Checklist(s) and Daily Trenching Log(s) filled out prior to starting excavation?
-
Excavations are shored and sloped back?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at safe distance from edge of trench or excavation?
-
Corrective Action:
Confined Space
-
All confined spaces labeled?
-
Employees working in confined spaces properly trained?
-
All Confined Space documentation (including permits) filled out?
-
Air monitoring taking place?
-
Attendant in place and focused on task?
-
Rescue/ retrieval system in place?
-
Corrective Action:
Material Handling
-
Materials properly stored and stacked?
-
Employees using proper lifting techiques?
-
Proper number of workers for each operation?
-
Corrective Action:
Welding And Burning
-
Gas cylinders stored up right and capped?
-
Proper separating distance between fuels and oxygen?
-
Goggles, sheild and proper PPE used?
-
Fire extinguishers readily accessible?
-
Hoses and regulators in good condition?
-
Corrective Action:
Cranes
-
Crane inspections complete and up-to-date?
-
Crane operators log up to date?
-
Operator is familiar with load chart?
-
Hand signal charts on crane?
-
Outriggers extended and swing radius barricade in place?
-
Employees kept from under suspended loads?
-
Tag lines used to guide loads?
-
Chains and slings inspected and tagged as required?
-
Overhead hazards marked and proper clearance maintained?
-
Corrective Action:
Mobile Equipment(Manlifts, Forklifts ect.)
-
Equipment inspected and maintained?
-
Machinery equipped with back up alarm and functioning properly?
-
Operators trained for specific equipment?
-
Operators manual, safety manual and warning labels in place?
-
Corrective Action:
Concrete Construction
-
Employees are protected from cement dust?
-
Rebar bent over or capped to prevent impalement hazard?
-
Designated concrete wash out area being utilized?
-
Wash station readily accessible?
-
Corrective Action:
Personal Protective Equipment
-
Safety glasses being worn?
-
Respirators used when required? Proper respirator documentation available?
-
Hard hats being worn?
-
Task specific PPE worn as required?
-
Employees wearing appropriate gloves for the task?
-
Hearing protection being worn where required?
-
Corrective Action:
-
General Comments:
-
Safety Representative
-
Project Manager/ Superintendent
-
Sketches: