Title Page
-
Site conducted
-
Conducted on
-
Weather
-
Location
-
Staff – everyone present and appear in good health
-
Temperature checks completed
-
All staff applying hygiene rules
-
All staff applying 1 m rule
-
Any non-confomance with Covid-19 procedures
-
PPE check
-
Communications checked and working (radio's)
-
All fire doors unlocked in areas of operation
-
Fire extinguishers & hoses visually checked weekly
-
Vehicular traffic routes free of obstruction
-
Pedestrian walkways free of obstruction
-
Plant pre-start-up checklists complete and PDF saved to file
-
Vehicles checked for Fuel, Oil, Water
-
All static plant cleaned before and after use - outside & inside
-
All guarding in place & fit for purpose
-
All belts checked for damage or tears
-
Monitoring station turned on and all cameras working
-
Skips all empty
-
Baled material 10mtrs from building & stacked
-
Spill kits – no rubbish, full, visible
-
Interceptors & drains – running, without blockages
-
Dust – suppression in use if required
-
Pests – flies & seagulls controlled
-
Odour – no noticeable odour outside site boundary
Permit to Work
-
Please make a note of all visitors to site or Permits raised this week for the CV-19 trace and protect scheme
Comments
-
Anything additional or out of the ordinary that occurred this week?
Confirmation
-
By signing this form I confirm that the above information is correct and that daily checks have been completed throughout the week as per the site licence and working plan.