Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Plant Type:
-
Manufacturer:
-
Model:
-
Year:
-
Hours (if applicable):
-
Date of commission:
-
NA or Comment
-
Have risk assessments been carried out, and are they available?
-
Have safe systems of work been written and are operators trained?
-
Has the equipment been added to the insurance policy?
-
Has a copy of the operators manual been obtained?
-
Is all access & egress in good order & clear of any obstruction?
-
Is there a pre-start check sheet?
-
Are grab rails available and in good condition?
-
Do brakes function as intended, including parking brake?
-
Is all moving machinery guarded?
-
Are all guards effective, secure and in good order?
-
Is an obstruction beacon fitted and working?
-
Is a seatbelt fitted and work as intended?
-
Is a horn fitted and works as intended?
-
Are reversing cameras fitted and work as intended?
-
Do windscreen wipers and screen wash work as intended?
-
Is the vehicle cab fitted with adequate mirrors?
-
Is equipment free from leaks?
-
VHF radio fitted within cab and works as intended?
-
Are all nip points guarded?
-
Are machine / equipment emergency stop buttons fitted?
-
Are stop buttons / isolators labelled?
-
Do emergency stop buttons work as intended?
-
Is all artificial lighting effective and in good order?
-
Are all steps protected with non-slip material and in good order?
-
Are there flat even surfaces at the bottom of all steps?
-
Are vertical ladders fitted with safety hoops that conform to BS 5395?
-
Are tyres treads safe and in good condition?
-
Are wheel chocks fitted and in good working order?
-
Are all electrical cables secured?
-
Are all hydraulic hoses secured?
-
Are fire extinguishers fitted?
-
Are all inspection hatches secure?
-
Are confined spaces identified?
-
Has the noise level been measured and assessed?
-
Is there any exposure to any hazardous substances?
-
Are hydraulic systems secure and labelled?
-
Are all pneumatic systems secure and labelled?
-
Is in-cab ventilation adequate?
-
Are areas of high or low temperature identified?
-
Is all equipment / machinery stable and secure, where required?
-
Engine oil and hydraulic oil levels adequate?
-
Is an adequate level of warning & safety signage fitted?
-
Are all doors secured?
-
Whom/Timing
PART TWO – Confirmation of commissioning process
-
Operations Manager
-
I confirm that I have carried out an inspection of the works to date, and subject to any pre-start defect in Part One, the plant is safe to commission
-
Signed :
-
Date :
-
Job Title:
-
Responsible Manager
-
Signed:
-
Date: