Title Page
-
Conducted on
-
Prepared by
-
Location
Site Information
-
Project Location:
-
Project Number:
-
Date/Time:
-
Inspector:
-
Superintendent:
-
Work Description:
Inspection
1. Personal Protective Equipment
-
Is Personal Protective Equipment part of this week's inspection?
-
1.1 Safety Glasses
-
1.2 Head Protection
-
1.3 Hearing Protection
-
1.4 Foot Protection
-
1.5 Hand Protection
-
1.6 Fall Protection
-
1.7 Faceshield/Googles
-
1.8 Respirator
-
1.9 Natural Clothing
-
1.10 Body Protection/FR
2. Policies, Procedures & Permits
-
Are Policies, Procedures & Permits part of this week's inspection?
-
2.1 Lift/Handling
-
2.2 Permits
-
2.3 Barricades/Warnings
-
2.4 GFCI/Assured Grounding
-
2.5 JSA's/Safety Meetings
-
2.6 Emergency Evac/Alarm
-
2.7 Containers Labeled
-
2.8 Fire Protection
-
2.9 Lockout/Tagout
-
2.10 Labor Law/WC Posting
3. Equipment & Tools
-
Are Equipment & Tools part of this week's inspection?
-
3.1 Hand Operated
-
3.2 Portable Power Tools
-
3.3 Hoisting/Rigging Equipment
-
3.4 Temporary Power/GFCI
-
3.5 Electrical Cords
-
3.6 Air Hoses
-
3.7 Fire Extinguisher
-
3.8 Ladders
-
3.9 Scaffolds
-
Welders/Leads
4. Facility, Compound & Storage
-
Will Facility, Compound & Storage be part of this week's inspection?
-
4.1 Floors/Walls
-
4.2 Electrical
-
4.3 Lighting
-
4.4 Evacuation Map
-
4.5 Exit Signs
-
4.6 Material Storage
-
4.7 Walkways/Exit
-
4.8 Housekeeping
5. Equipment Operations
-
Is Equipment Operations part of this week's inspection?
-
5.1 Operators Cards
-
5.2 Maintenance
-
5.3 Inspection Records
-
5.4 Safe Operations
6. Confined Spaces
-
Are Confined Spaces part of this week's inspection?
-
6.1 Entry Permit
-
6.2 O2/CO2/SO2/H2S lel
-
6.3 Sign In/Out
-
6.4 Communication
-
6.5 Lights/Ventilation
-
6.6 Rescue Plan
-
6.7 Safety Harness
7. Hazardous Material Abatement
-
Are Hazardous Material Abatement part of this week's inspection?
-
7.1 Competent Person on site
-
7.2 Barricade/Signage
-
7.3 Protective Clothing
-
7.4 Footwear
-
7.5 Containment/Decon
-
7.6 Sign In/Out
-
7.7 Documentation
-
7.8 Respirator Usage
8. Environmental
-
Is Environmental par of this week's inspection?
-
8.1 Drums/Containers
-
8.2 Labels
-
8.3 Spill Kit Available
-
8.4 Containers Closed
-
8.5 Accumulation Start Date
-
8.6 General Conditions
9. Scaffolding
-
Is Scaffolding part of this week's inspection?
-
9.1 Safe Access
-
9.2 Handrails/Midrails
-
9.3 Toe Boards/Netting
-
9.4 Decking
-
9.5 Properly Braced
-
9.6 Proper Foundation
-
9.7 Inspected/Tagged
-
Inspector Signature
-
Supervisor Signature