Information

  • Job Number and Name

  • Location
  • Building's Name and Level

  • System(s) Inspected

  • Conducted on

  • Inspected by

  • 211200 Standpipe

  • 211313 Wet Pipe System

  • 213000 Fire Pump

  • Document No.

Execution of Work

Hangers

  • Are hangers straight and plumb

  • Are hangers installed to manufacturer's guidelines

  • Proper spacing of hangers and supports for piping and independently supported?

  • Are hangers of the CORPS listed approved material

Pipe, Fittings and Valves

  • Is proper schedule of pipe being used? (2-1/2" and larger diameter pipe Schedule 10 and 2" and smaller diameter pipe Schedule 40)

  • Has all pipe been pressure/water tested?

  • Are joints and fittings properly installed

  • All valves and devices are accessible

  • All floor control valves are installed properly

  • Verify that indicating valve is working and in the correct position for system condition?

  • Drain line installed

  • Is pipe and fittings installed are free of foreign debris or corrision

  • No piping, wiring or duct is touching sprinkler pipe

  • Are all outlet capped and plugged at the end of shift?

  • No more than 4 threads visible on threaded joints?

  • All bolts shall extend no less than three full threads

  • Are all bolts torqued to manufacturer's guidelines?

  • All material installed meet CORPS approval?

Sprinkler Heads and Flexible Connections

  • Are the proper temperature rating sprinkler heads installed?

  • Are brackets attached to ceiling grid as per manufacturer's guidelines

  • Are sprinkler head guards installed properly

  • All material installed meets CORPS approval ?

Design Installation

  • Are hangers within 12" of the end of the line

  • No sprinkler heads are further than 7'-6" or closer than 6" from walls

  • Sprinkler heads are installed under ductwork 4'-0" or greater

  • Mechanical rooms with ceilings lower than 8' above FF have sprinkler heads with guards?

Underground

  • Is bedding at the proper depth and material?

  • Are all bolts torqued to manufacturer's specification?

  • Are all rods and bolts are tar coated?

  • Is tracker wire installed

  • Is marking tape 1' foot above pipe?

  • Is underground installed as per drawings

Miscellaneous

  • Work area is clean and free debris (cut off rods, plastic plugs and caps)

  • Is fire stopping installed at all wall and/or floor pentrations

  • Is sprinkler system(s) installed as per drawings?

Comments

Material Deficiency

Installation Deficiency

Damaged Material

Additional Comments

  • Additional Pictures

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.