Title Page

  • Project Name

  • Client

  • Conducted on

  • Instruction Number/Ref (where required):

  • READ HERE FIRST

  • 1) In relation to hourly works require hours spent noted (for an example 7.00am to 9.30am, 3.00pm to 5.30pm) as different hours to be charged at different rates depending on the time (morning or afternoon).
    2) It also needs to have description of work carried out (work, what is the location done & any relevant photos) before and after.
    3) Anybody who will be travelling for hourly works (who is not on site) , please note down their travel location & their travel time.

  • Employee Name(s) and Hours worked

  • Machinery/Other hours (please note if dry or wet hire and type of machinery e.g. 5 tone, Posi Track, Ridged, 14t ex etc)

  • Detail of works completed

  • Were the works to a satisfactory condition?

  • Photos

  • Client signature

  • SuperStruct representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.