Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Variation Work - Breakdown
-
Variation Scope of Work
-
Location of Variation Works (DC Block #, PCU #, MV Feeder #)
-
Labour Requirements (eg. 2 x TA + 1 Operator = 8 x Hrs)
-
Plant & Equipment Requirements (1 x Moxy = 3 Hrs)
-
Materials Used for Works Completed
-
Water Qty used for works (L)
-
Additional Information
-
Client Sign Off (PCL)
-
Contractor Sign Off (JLE)
-
Supporting Documentation (Photos of Day Dockets/ Variation Works)