Title Page

  • Document No.

  • DB Building Contracts HSEQ Audit

  • Site

  • Conducted on

  • Prepared by

  • Site Manager Name

Safe system of work

Safe system of work

  • Construction Phase Health & Safety Plan produced and available on site?

  • Statutory notices displayed NI10

  • Law poster displayed with name and phone numbers displayed.

  • Method statements, risk assessments in place for sub-contractor works and DB Contracts on site and signed by all operatives?

  • Induction records in place for all operatives on site? As part of the audit a sample will take place to confirm compliance.

  • Training records available for operatives on site to include CSR, CSCS, plant etc

  • Emergency Procedure displayed?

  • Health & Wellbeing information on display?

  • Have previous items from last audit been closed?

  • Scaffolding in good working condition (Guardrails, toeboards, access ladders tied, planks in good condition?

  • Scaffolding Handover Certs available?

  • Scaff tags in place at each access point, dated and signed off (Weekly Inspections)

  • Edge Protection / Roof edge protection, voids, risers, stairwells?

Health & Safety Management

Health & Safety Management

  • Health and Safety policy statement available?

  • DB Building Contracts insurance on display?

  • Plant & Equipment certificates (Thorough Examinations) in place along with pre-use inspections?<br>(e.g: FLT / Excavators / Skips)

  • LOLER Register / checks including certs for slings, chains etc...?

  • Underground cables - (CAT Scanned, marked out, service drawings, permits to dig)?

  • Permits to work (Hot works, confined spaces, permit to dig etc...)?

  • H&S Toolbox talks being completed?

  • Accident investigation records (if applicable?)

  • Weekly supervisor checks?

  • Welfare facilities compliant with the project requirements? (Toilets, Canteen, Hot & Cold water with soap)

  • Weekly inspections carried out on deep excavations?

  • Barriers & Signage in place at excavations?

Lifting Operations

  • Crane & lifting equipment certs including weekly checks?

  • Exclusion zone in place with barriers and signage?

  • Lift Plan (set down area, locations plan)

  • Slinger / lift supervisor training available?

Environmental Management

Environmental Management

  • CoSHH risk assessments and MSDS on file.

  • COSHH store in place with signage?

  • Skip hire contractor waste licenses?

  • Waste transfer license? dockets / consignment notes?

  • Pollution control measures (Re-fuelling point, bunded bowsers, spill kit

  • Skip secured to prevent unauthorised access / waste blowing out?

  • Roadways leading out of site in good condition (visible muck / debris on road)?

Site Conditions

Site Conditions

  • Fire Assembly Point & Signage?

  • Fire Risk Assessment?

  • Fire Drills

  • Fire Extinguishers in place and serviced?

  • Sign in sheet in place and in use?

  • First aid kit available & First Aider

  • PPE - does it follow the RAMS? Note: Protective footwear, Hi-visibility clothing and head protection is mandatory on ALL sites at all times by ALL trades.

  • Site security / boundary sufficient, lockable gates?

  • Adequate Lighting?

  • Housekeeping (cable management, waste, clear walkways)

  • Site compound maintained?

Traffic Management

  • Traffic Management Plan in place?

  • Parking / Delivery area identified / sufficent?

  • Access & Egress into and around site?

  • Speed limit in place with signage?

Audit acceptance

  • Site Manager

  • Select date

  • Auditor

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.