Title Page
-
DC UPS Inspection
-
Client
-
Conducted on
-
Prepared by
-
Add site
DC UPS
-
Asset Name:
Charger / Cabinet Details
-
Enter Location Details
-
Enter Make/Mode
-
System Voltage
- 12V
- 24V
- 48V
- 110V
- 240V
Battery Details
-
Enter Make/Model/Amp hours
-
Battery Quantity
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
Inspection
-
Electrical Inspection - Inspect terminations, capacitors (swelling/heat), correct insulation / segregation (240V)
-
Mechanical Inspection - are all fixtures, components secure and in good working order with adequate protection from the elements?
-
Room / Cabinet Ventilation Sufficient?
-
Charger Indicator Lights Operating?
-
Is the charger online with no alarms?
Charger and Battery Testing
-
Record Average Battery Temperature
-
Record Battery Bank Voltage
-
Record DC Current
-
Record AC Ripple Current
-
Record Rectifier Current
-
Charger on Float?
-
Record Charger Current Limit
-
Record AC Input Voltage
-
Record DC Float / Output Voltage
-
Record DC Output Current
Discharge Test
-
Record Discharge Current
-
Record Test Duration
-
Record End Battery Voltage
-
Comments
Battery Discharge Results
-
Was the Battery Tested on Float or Discharge?
-
Individual Battery Voltage
Battery No.
-
Voltage
Recommendations
-
Charger / UPS Online with No Alarms
-
Record any recommended repairs or future inspection intervals
-
Add Pictures