Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Underground Services
-
1.1 Are all Utility Plans / Drawings on site? Do they clearly show position of apparatus, and are they for the correct location, legible & within 3 months of being issued to supervisor? Has a utility survey been carried out?
-
1.2 Cat & Genny checked prior to use and working correctly? Is calibration date valid
-
1.3 Is there an adequate number of operatives to carry out the task?
-
1.4 Has squad checked for surrounding visible indicative utilities?
-
1.5 Position of utilities marked with wax crayon on hard surfaces or biodegradable paint for grass / soil?
-
1.6 CAT & Genny next to excavation point and regular sweeps being carried out
-
1.7 Power tools not used within 500mm of known / suspected utilities?
-
1.8 Check operatives certification for the CAT
-
1.9 Are all PTD in place and up to date
-
1.10 Trial holes hand dug prior to use of excavator?
-
1.11 Condition of lifting appliance / excavator?
-
1.12 Lifting assessment/plan in place
-
1.13 Suitably trained Slinger
-
1.14 Plant operator CPCS cards in date?
-
1.15 Lifting appliance inspection due date?
-
1.16 Daily inspection form completed for mobile plant , excavators etc?
-
1.17 Are Chains and slings tagged and within inspection date?
-
1.18 Are slings within inspection date and in visually good condition?
-
1.19 Other comments and associated photographs
Working in Carriageways
-
2.1 NRSWA ID on site and current if applicable<br>Card Name, No, Expiry date to be included
-
2.2 Seek evidence to see if the Site Manager has a NRSWA ticket
-
2.3 Traffic management plan in place & clearly on display
-
2.4 Permits for local council available for inspection.
-
2.5 Signage/barriers correctly installed in accordance with traffic management plan
-
2.6 Other comments
Site Safety
-
3.1 Are risk assessments available for inspection.
-
3.2 Have all operatives been briefed on their relevant risk assessments and recorded.
-
3.3 Are on site Risk Assessment carried out on all job’s and site specific for the task?
-
3.4 Are sub- contractors supervisors capable of identifying additional hazards & control measures required?
-
3.5 Have the Risk assessments (including those detailing any additional hazards identified) been checked and counter signed by the Contracts Manager?
-
3.6 Is there a approved Method Statement for the pending task? Recorded and site specific?
-
3.7 Is the correct personal protective equipment and clothing available and is it used correctly? (e.g. Hard hat ,hearing protection, Hi Vis Vests/Jackets ,boots etc.)
-
3.8 Hand equipment and tools in good condition.
-
3.9 Is hired equipment checked on a regular basis? Check sheets available?
-
3.10 Is any other equipment regularly serviced?
-
3.11 Is the above equipment tagged?
-
3.12 Position of plant and material. (i.e. is it safely and effectively positioned and in a way that reduces risks from any leakage or refuelling spillage).
-
3.13 Material Storage (safe height, stable, secure).
-
3.14 Is work area clear and hazard free?
-
3.15 Are permits to work being issued and monitored for high risk operations ?
-
3.16 HAV’s : Job rotation, dampers on equipment, hand protection (gloves)
-
3.17 Are vibration exposure times being monitored and within limits Permit being issued?
-
3.18 Other comments
Excavation work
-
4.1 Is the stability of excavation good
-
4.2 Appropriate use of shoring equipment where this is necessary.
-
4.3 Temporary Works design available for inspection
-
4.4 Safe means of access and egress from excavation: i.e. ladder.
-
4.5 Is Stihl saw being used in accordance with manufacturers instructions . Check Blade?
-
4.6 Is dust suppression kit fitted and functioning on cutting equipment?
-
4.7 Have excavations been inspected & signed off?
-
4.8 Rigid barriers / appropriate signage is around excavation perimeter.
-
4.9 Permit to excavate is being utilised
-
4.10 Other comments
Environmental management
-
5.1 Noise issues are being addressed
-
5.2 Are operatives wearing appropriate ear protection?
-
5.3 Dust issues are being addressed
-
5.4 Waste issues are being addressed
-
5.5 Effluent discharge issues are being addressed
-
5.6 Vibration issues are being addressed
-
5.7 Other comments
Scaffolding/working at height
-
6.1 Scaffolding has been erected by certificated persons & tower register is up to date
-
6.2 Activities at height are controlled with risk of falls addressed
-
6.3 Scafftags are displayed & up to date on all initial access points
-
6.4 Internal ladder access is available
-
6.5 General conditions of components – boards, tubes, fillings etc
-
6.6 All platforms – regardless of height have double guardrails and toe boards if being used as a working platform.
-
6.7 Other means of fall protection are being utilised where appropriate i.e. nets, bags, MEWP’s etc.
-
6.8 Other comments
Plant safety checks (Internal)
-
7.1 Cleanliness & tidiness of vehicle, Including General storage
-
7.2 Pre-shift check sheet available and up to date
-
7.3 CPCS card available for operative
-
7.4 Certificate of conformity/thorough examination certificates inspected.
-
7.5 Other comments
Vehicle safety checks (External)
-
8.1 Cleanliness & General Condition of vehicle (Including condition of windscreen, mirrors and tyres)
-
8.2 Vehicle lights working and lenses in good condition.
-
8.3 Weekly inspection sheets completed & available for inspection
-
8.4 Keys removed from all vehicles not in use
-
8.5 ROPS all in place
-
8.6 Tow bar secure, correct tow pin and locking clip fitted and Jockey wheel in good condition (dumpers )
-
8.7 Other Comments
COSHH/Flammable
-
9.1 Are COSHH assessments available for materials being used & control measures implemented (drip Trays etc)?
-
9.2 Does the available PPE match the COSHH requirements carried? (e.g. are the gloves carried suitable for working with fuel)
-
9.3 Are Hazard signs on containers and Containers clearly labelled?
-
9.4 Storage of flammable materials (approved containers & quantity)
-
9.5 Flammable warning sign.
-
9.6 Other comments
Communication/Supervision
-
10.1 Have all operatives reported to Site security Gate?
-
10.2 Do operatives know who their health and safety rep. is ?
-
10.3 Do operatives know where their H&S notice board is?
-
10.4 Have all operatives signed RAMS applicable to their work
-
10.5 Have sub-contractors been briefed on Toolbox talks fortnightly & are they able to demonstrate understanding of it?
-
10.6 Other comments
Welfare facilities
-
11.1 Adequate storage available for tools
-
11.2 General condition of site cabins is good.
-
11.3 First Aid box has sufficient supplies
-
11.4 Other Comments
Emergency preparedness and equipment
-
12.1 Fire extinguishers within service date and easily accessible?<br>(If Required/Where available).
-
12.2 Is there a Trained First Aider available?
-
12.3 Is there an accident book on site?
-
12.4 Are spill kits present within a reasonable distance of any mobile or semi static kit in use?
-
12.5 Other comments
Traffic Management/ Access/Egress arrangements
-
13.1 Adequate safety signage is displayed
-
13.2 All access points are secure?
-
13.3 Perimeter fencing suitable, is in good condition & secure
-
13.4 Procedure for inspection of fencing & recording findings
-
13.5 Clear traffic management in place, separation of persons and vehicles
-
13.6 Use of banksmen for movement of vehicles, control of delivery vehicles
-
13.7 Other comments
Asbestos
-
Has the presence of asbestos been identified
-
If asbestos has been identified has the area been cordoned off and secured?
-
Has the problem been reported?
-
Are warning signs displayed?
-
Are all contaminated clothes, rags or PPE been removed and stored in a sealed bag?
-
Have Asbestos removal contractors/Clients/ Principal contractors/site staff been informed?
-
Add signature
Miscellaneous
-
Additional information required