Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Reason for excavation
-
Prepared by
-
Location
Untitled Page
-
Has reinstatement been completed
-
Has all Excavated materials been removed
-
Is site clear of all chapter 8 and TM
-
Is area clean and tidy
-
Are there any damages in area of works
-
Are any spillages present
-
Has all edges been cut correctly
-
Does the reinstatement materials match existing
-
Have any edging kerbs and road kerbs been put back
-
Does the reinstatement look acceptable
-
Reinstatement measurements been taken
-
Has reinstatement measurements been registered to prevent FPN
-
What company carried out the reinstatement
-
Date of Reinstatement
-
Are you happy with all works
-
Is reinstatement temp or permanent
Sign off
-
Name and signature off Auditor