Title Page
-
Location
-
Prepared by
-
Conducted on
-
Customer name
-
Customer contact number
Electrical Inspection
-
Is there any damage to service cutout/metering equipment?
-
Has this been reported to DNO/supplier?
-
Is there any evidence of meter tampering?
-
Has this been reported to the compliance/SHE team?
-
Does the property have an isolator?
-
Does the property have solar PV?
-
Is the main protective bonding to gas and water in place?
-
Does the kitchen ring final circuit need to be rewired?
-
Does the cooker circuit need to be rewired?
-
Does the shower circuit have to be installed/rewired?
-
Does the customer have any decorative lighting fixtures that are to be reinstated?
-
Are there any further comments on the electrical inspection?
Property Inspection
-
Is the customer capable of preparing the property for the rewire works?
-
Are there any items of furniture that the customer isn't able to move before works commence?
-
Does the customer require a skip?
-
Is there any laminate/vinyl flooring to be taken up?
-
Will the customer remove the flooring themselves?
-
Which rooms require flooring to be taken up?
-
Is the loft space clear and free from obstructions?
-
Is the customer willing to clear the loft themselves?
-
Will the property require a full kitchen splash back?
-
Will the customer provide the tiles?
-
Are there any specific areas of the property that are not to be disturbed?
-
Are there any large items such as appliances that could potentially be damaged during the rewire works?
-
Has a decorating allowance been agreed with the customer?
-
Has the replacement of flooring been agreed with the customer?
-
Are there any further comments on the property inspection?
Date Of Works
-
Has a date of works been agreed with the customer?
-
Any further comments or requests from the customer?
-
Any further comments from the surveyor?