Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre handover defects list
- Pre handover defects list
-
Describe the defect identified
-
Was this rectified?
-
Date of Defect
Pre handover practical completion checklist
Pre hand over checklist
-
Certificate of final inspection; (Occupancy)
-
Certificate of clearance of reinstatement of damage to footpath and road etc. from the relevant authority
-
Certificates of Clearance associated with the removal of hazardous materials
-
Confirmation that final clean and cleaning of site access roads is complete
-
Electrical Certificate
-
Engineering Certificate
-
Final report confirming compliance with requirements from Cultural Heritage Management Plan if required
-
Handing over of keys, tagged and labelled as specified
-
HVAC Certificate
-
Handover of O&M Manuals and As-built drawings, Warranties and Guarantee’s
-
Glazing Certificate
-
Lighting Lux Levels Certificate
-
Plumbing Certificate
-
Playground Equipment Audit Certificate
-
Reinstatement of adjoining public and private property (E.g reinstate fence)
-
Waterproofing certificate
Defects Liability Period (from Practical Completion Date)
- Defects found
-
What defect has been identified?
-
What is the urgency of this defect?
- Critical/Urgent - fix within 24 hours of notification.
- Safety Issue - fix within 3 days of notification.
- Causes Disruptions - fix within 7 days of notification.
- Low Priority - fix within 14 days of notification.
-
Please select Notify if defect is urgent
-
Please provide photos of this defect
Sign Off by Project Manager
undefined
-
Architect
-
Contractor
-
Consultant
-
Engineer
-
HBCC Parks
-
HBCC Facilities
-
Project Manager