Title Page

  • Site conducted

  • Date

  • Client / Site
  • Person conducting inspection

Page 1

1. Administration

  • Contractor induction in place

  • COVID-19 safe plan in place

  • Staff members wearing masks in accordance with government guidelines at the current time

Page 2

2. Health & Safety Systems

  • Contractor’s OHS system is onsite and able to be accessed

  • SWMS / JSA / other safety task documents available, signed by employees conducting work

  • Permit to Work for High Risk Work completed (eg. Asbestos treatment or removal, confined spaces, hot works, excavation, penetration or demo, working at heights)

  • Asbestos, soil contamination, hazardous materials reports as applicable onsite

  • Asbestos Management Plan, Soil Contamination Management Plan in place

  • Contract Health & Safety Plan available

  • Emergency procedures for site in place

  • Register of all incidents, hazards and injuries including ‘notifiable incidents’ that are reported to Worksafe

  • First aid kit onsite, accessible

  • First aid kit serviced & replenished, has record of medical supplies used

  • One accredited First Aid Officer (Level 2) on site

  • Traffic Management Plan for any works on or adjacent to a road, with written consent from Coordinating Road Authority

  • Permits available (e.g. Building, Demolition, Works on Waterways)

  • School, Kindergarten or Childcare Centres - Working With Children Checks available for all persons attending site?

Page 3

3. Housekeeping

  • Work areas free from rubbish and obstructions

  • Free from slip/trip hazards

  • Stock/material safely stored

4. Excavation

  • Dial Before You Dig / service plans available

  • Shoring in place in sound condition

  • Banks battered and loose soil away from edge

5. Electrical

  • Are Dial Before You Dig Plans available and relevant services located & marked onsite

  • No broken plugs, sockets, switches coming from gangbox (primary power source/switchboard for builder)

  • Insulated and non-conductive ladders used for electrical work

  • No work near exposed live electrical equipment<br>

  • Work under overhead power lines has protection in place (eg. zebra tape, spotter, exclusions zones)

  • Tools and leads inspected and tagged (Const sites)

  • RCD protection used?

  • Lock out procedures/danger tags in place

  • Dry Chemical Fire Extinguisher Present

Page 4

6. Mobile Plant and Equipment

  • Daily safety inspection procedures/checklists

  • Warning and instructions displayed (eg. for PPE, crane lift, workers above, trenching, forklift, mobile plant, generator electrical signage, etc.)

  • Safe Working Load of lifting or carrying equipment displayed - spot check nearest plant

  • Operators trained and licensed - spot check nearest plant

  • Emergency stops appropriately placed and clearly identifiable - spot check nearest plant

  • Reversing alarm operational - spot check nearest moving plant

  • Does the electrical generator have RCD protection?

Page 5

7. Hazardous Substances

  • Safety Data Sheets (SDS) available

  • Chemical register available

  • Containers labelled and clearly identified

  • Ventilation/exhaust systems present

  • Protective clothing/equipment available/used

Page 6

8. Welding

  • Welding fumes well ventilated

  • Fire extinguisher near work area

  • Gas bottles securely fixed to trolley

  • Vision screens or welding mask used for welding

  • LPG bottles within 10 year stamp

  • PPE provided and worn

  • Hot Work Permit system used

9. Prevention of Falls

  • Fall prevention in place for works above 2m (Scaffolding, Elevated Work Platforms, Harness Protection)

  • All work platforms have secure handrails, guarding

  • All floor penetrations covered or barricaded

  • Unsafe areas signposted and fenced

10. Ladders

  • Ladders are not used to support planks for working platforms

  • Platform ladders used above 2 metres

11. Personal Protection

  • Employees provided with PPE

12. Demolition

  • Signage and barriers are in place isolating demolition works from general public

  • Overhead protection in place

  • Access prevented to demolition area (eg. perimeter fencing, spotters, other protection of public)

  • SWMS / JSA undertaken in advance

Page 7

13. Public Protection

  • Barricades, fencing, hoarding, gantry secure and in place

  • Site & mandatory site signage in place (eg. site construction board above $350,000)

  • Lighting for public access onsite<br>

  • Dust and noise controls in place

14. Amenities

  • Toilet/dining facilities available

15. Final Comments

  • undefined

Page 8

  • Inspectors Signature

  • Contractors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.