INSPECTION CHECKLIST
Inspection Checklist
-
Site sign in/out process completed
-
Contractor induction completed
-
Lock Out/Tag Out and Isolation's Register completed
-
SWMS or other risk assessment documentation in place
-
Contractor(s) working in accordance with SWMS or risk assessment documentation
-
Applicable permits have been identified and are in place and are being complied with
-
Signage and barriers are in place, isolating work area from general public
-
Good housekeeping practices in place
-
Contractor(s) wearing Personal Protective Equipment (PPE) as specified in applicable safety protocols for the work
-
Portable electrical items and leads electrically tested and tagged
-
Residual current devices in use, where required
-
Insulated or non-conductive ladders are used for electrical work
-
Fall risks are controlled
-
Contractor has confirmed that hazardous chemicals are appropriately labelled and stored
-
Safety Data Sheets available for hazardous chemicals
-
Contractor(s) have current licences/competencies to carry out work E.g. operation of plant and equipment
-
Traffic management protocols are in place for the use of mobile plant
-
Traffic management protocols in place where there is a risk of interaction with personnel, other vehicles or falling objects
-
Contractors aware of the site emergency protocols, including first aiders/wardens
-
Hoarding in place and design certifications available upon request
-
Other (please specify):
-