Right Of Way
-
Is all rubbish and construction material being progressively picked up in front of rehabilitation?
-
Has topsoil been respread along construction ROW within 3 months of construction?
-
Has the trench been backfilled within 3 months?
-
Has progressive reinstatement of ROW been implemented within 6 months of completion of construction activities?
-
Is the topsoil being spread over the same area it was removed from?
-
Is the topsoil being spread over the cleared area last?
-
Is vegetation that was cleared from the area being spread over topsoil?
-
Has all flagging and poles been removed from rehabilitation area?
-
Has all surplus materials been disposed of correctly after backfill and rehabilitation?
Erosion and Sediment Control
-
Has rehabilitation on major watercourse crossings been done in accordance with the ESCP?
-
Has a CPESC identified erosion and sediment risks and implemented control measures through a progressive ESCP?
-
Have high erosion areas been rehabilitated with erosion and sediment control measures, such as, berms or mesh on banks?
-
After rehabilitation, is a CPESC signing off on areas that have a high risk of erosion within 1 month?
-
Are temporary erosion and sediment controls established during rehabilitation being maintained?
-
Have permanent drainage controls (berms or whoa boys) been installed in accordance with the ESCP for rehabilitation at the correct intervals on slopes and watercourses?
Weed and Seed
-
Have all vehicles working in and around topsoil been cleaned and re-certified when entering and exiting weed hygiene zones?
-
Has topsoil been spread back on the same side of the weed and seed hygiene location that it come from?
-
Has all imported fill been certified weed free and be accompanied by a certificate before arriving to site?
-
If wet weather occurs and clean downs are required, is the equipment to carry out a clean down available?
-
Are weed and seed hygiene locations keeping an active log of all the plant and equipment that use the facility?
-
Are environmental crew members monitoring weed and seed controls during rehabilitation?
Temporary Infrastructure
-
Is a dilapidation report being prepared for all decommissioned infrastructure (access tracks, camp sites, water storage dams)?
-
Is all temporary infrastructure being reinstated in the following order;<br>1. infrastructure removal;<br>2. topsoil respread over surface;<br>3. re-contoured to match the surrounding landscape;<br>4. ripped where compacted;<br>5. cleared vegetation previously removed from area respread to act as ground cover?<br>
-
Are any dams that require de-watering being testing for pollutants prior to de-watering?
-
Is de-watering taking place in accordance with erosion and sediment control principles in place?
-
Are decommissioned dams being backfilled in the order the soil was removed?
-
Has all the gravel and imported fill been correctly removed from the decommissioned camp?
-
Have temporary access tracks, not wanting to be kept by the landholder, been reinstated with berms when required?
Permanent Infrastructure
-
Have all pre-construction infrastructure (pastoral fences and gates) been restored to their original condition?
Monitoring and Reporting
-
Is an environmental officer visiting the site weekly and ensuring the rehabilitation management plan is being followed?
-
Has the condition of the reinstated site been visually inspected while reinstatement is taking place?
-
Are run off and rain events being inspected around reinstated areas?
-
Are major watercourses being visually inspected while reinstated?