Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
-
Enter Date and Time
-
Project Name
-
Region
-
Regional Construction Manager
-
Project Manager
-
Supervisor/Foreman
Desktop Audit
-
Please provide evidence for Desktop Audit
-
1. Is there a Construction Workplace Plan on site?
-
2. Has the Construction Safety Plan been signed?
-
3. Has the Construction Safety Plan been fully implemented?
-
4. Is there a Safety Policy displayed on site?
-
5. Is there a Rehabilitation Policy displayed on site?
-
RAP: Desktop Audit
Site Specific Inductions
-
6. Have all workers received a site specific induction?
-
7. Have all blue / white cards been checked and are evidenced?
-
RAP: Inductions
Training & Competency
-
8. Is there evidence confirming competencies have been verified for workers operating machinery?
-
RAP: Training & Competency
Hazard Identification & Risk control
-
9. Has a tool box talk been conducted on how to do risk assessments?
-
10. Have risk assessments been conducted and have they been documented in the CSP? Table 1.1
-
11. Have project hazards been identified and have they been documented in CSP? Table 1.1
-
12. Are the appropriate SWMS in place for the project?
-
13. Have SWMS been reviewed before the commencement of work and been recorded?
-
RAP: Hazard & Risk
High Risk Activity
-
14. Are any high risk activities being undertaken on site ? Check SWMS signatures
-
15. Have appropriate permits been filled out and obtained?
-
16. Is there a TMP (Traffic Management Plan) or TGS (Traffic Guidance Scheme) in place?
-
RAP: High Risk Activity
Subcontractor controls
-
17. Have all staff and subcontractors been site inducted?
-
18. Have subcontractors signed an agreement to adhere to Shadforth's safety requirements?
-
19. Are subcontractors on site signed on to the appropriate SWMS?
-
20. Have subcontractor SWMS been reviewed? Table 1.2
-
21. Have random spot checks been undertaken on subcontractors?
-
22. Is the subcontractor procedure displayed in the site office / crib rooms?
-
RAP: Subcontractors controls
General Work Place Management
-
23. Has a VMP (Vehicle Management Plan) been implemented for the site?
-
24. Is Issue Resolution Procedure displayed on site?
-
25. Is there a SDS (Safety Data Sheet) register on site and is it up to date?
-
RAP: General Work Place Management
Communication and Consultation
-
26. Are daily pre-start meetings being undertaken?
-
27. Are regular tool box talks been undertaken and documented?
-
RAP: Communication
Emergency Prepardness
-
28. Is there an emergency evacuation plan or procedure in place and is it displayed?
-
29. Has an emergency procedure drill been carried out?
-
RAP: Emergency
Managing Incidents
-
30. Have any incidents occurred on site and have they been documented?
-
31. Is Document SMS-03-02 - Incident Procedure displayed on site?
-
32. Are previous audits and inspections kept on site in the Site Safety Pack?
-
33. Have RAP's issued as a result of audits or inspections been closed out?
-
RAP: Incidents
Site Audit - Walk around
-
Please provide evidence for Site Audit - Walk around
First Aid
-
34. Is there a person responsible for first aid on site and are there details displayed?
-
35. Is the person responsible for first aid appropriately trained?
-
36. Are there sufficient first aid kits in the workplace and are the contents in date?
-
37. Is there a sharps kit available?
-
RAP: First Aid
Amenities
-
38. Are there toilets available?
-
39. Are amenities available and are they clean?
-
40. Are hand washing facilities and clean drinking water available?
-
RAP: Amenities
Electrical
-
41. Is electrical equipment tested and tagged?
-
42. Is site shed protected by RCD?
-
RAP: Electrical
Fire Protection
-
43. Are there fire extinguishers on site and are they accessible?
-
44. Are inspections and test dates up to date? (Every 6 months)
-
45. Is the equipment appropriately marked?
-
RAP: Fire Protection
Hazardous Chemicals
-
46. Have all hazardous chemicals been identified, labelled and stored correctly?
-
47. Have risk assessments been completed where high or extreme hazardous chemicals exist?
-
48. Is storage area clean, tidy and appropriately ventilated?
-
49. Is there a spills kit available?
-
RAP: Hazardous Chemicals
Lifting Equipment
-
50. Has all lifting equipment on site been inspected for testing and tagging?
-
51. Is there a register on site and has it been filled in correctly?
-
RAP: lifting Equipment
Signage
-
52. Are the mandatory signs in place? i.e. SDS / first aid / Fire extinguisher / hazardous chemicals?
-
53. Is the entry sign as per section 4 of the Construction Safety Plan in place?
-
54. Is there appropriate signage for the size of site indicating and advising unauthorised entry and use of appropriate PPE?
-
RAP: Signage
Trenching and Excavating
-
55. Are trenches benched, shored, battered or certified as per the regulations?
-
56. Are there adequate access ladders provided along the length of the trench?
-
57. Has an excavation permit been completed?
-
58. Is there appropriate access and egress points?
-
RAP: Trenching and Excavating
General Site Observation
-
59. Is mandatory PPE been used?
-
60. Are warning lights and reversing beepers operating?
-
61. Are daily pre-start checks been conducted on machinery and plant?
-
62. Are safety pins on excavators inserted?
-
63. Are barricades correctly erected around work areas?
-
64. Are safety caps on star pickets?
-
RAP: General Site Observation
Worker Observation - Select any worker/subcontractor on site and ask the following
-
65. Is the worker aware of the emergency plan?
-
66. Is the worker aware of the first aid on site?
-
67. Can the worker identify the first aider on site?
-
68. Can the worker identify the communication channel for site?
-
69. Can the worker provide details of items in the site induction?
-
RAP: Worker Observations
Hazard / Risk Identification Table 1.1
-
CSP table 1.1
-
Are there additional hazards/risks on site?
-
Procedure Steps
-
Hazards/Potential Hazards
-
Management Method (controls)
-
Person Responsible
Safe Work Method Statement Review Table 1.2
-
Have the work method statements been reviewed?
-
Project Specific Review
-
Enter date and time of project specific review
-
Subsequent Review
-
Enter date and time of subsequent review
Risk Assessments
-
Have risk assessments been completed on site?
RAP (Rectification Action Plan)
-
Enter details of RAP
Sign off
-
Enter Date
-
Please Sign