Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Site Information
Site Information
-
Site Location
-
Enter Date and Time
-
Project Name
-
Region
- Sunshine Coast
- Gladstone
- Mackay
- Main Roads
- Minines
-
Regional Construction Manager
- Sunshine Coast
- Gladstone
- NDRRA
- Mackay
- Mines
-
Project Manager
-
Foreman/Supervisor
Desktop Audit
Rectification Action Plans from previous Audit
-
Have the RAP's (Rectification Action Plans) from the previous audit been closed closed out ?
Desktop Audit
-
1. Is there a Construction Workplace Plan on site?
-
2. Has the Construction Safety Plan been signed?
-
3. Has the Construction Safety Plan been fully implemented?
-
4. Is there a Safety Policy displayed on site?
-
5. Is there a Rehabilitation Policy displayed on site?
Site Specific Inductions
-
6. Have all workers received a site specific induction?
-
7. Have all blue / white cards been checked and are evidenced?
Training & Competency
-
8. Is there evidence confirming competencies have been verified for workers operating machinery?
Hazard Identification & Risk control
-
9. Has a tool box talk been conducted on how to do risk assessments?
-
10. Have risk assessments been conducted and have they been documented in the CSP? Table 1.1
-
11. Have project hazards been identified and have they been documented in CSP? Table 1.1
-
12. Are the appropriate SWMS in place for the project?
-
13. Have SWMS been reviewed before the commencement of work and been recorded?
High Risk Activity
-
14. Are any high risk activities being undertaken on site ? Check SWMS signatures
-
15. Have appropriate permits been filled out and obtained?
-
16. Is there a TMP (Traffic Management Plan) or TGS (Traffic Guidance Scheme) in place?
Subcontractor Controls
-
17. Have all staff and subcontractors been site inducted?
-
18. Have subcontractors signed an agreement to adhere to Shadforth's safety requirements?
-
19. Are subcontractors on site signed on to the appropriate SWMS?
-
20. Have subcontractor SWMS been reviewed? Table 1.2
-
21. Have random spot checks been undertaken on subcontractors?
-
22. Is the subcontractor procedure displayed in the site office / crib rooms?
General Work Place Management
-
23. Has a VMP (Vehicle Management Plan) been implemented for the site?
-
24. Is Issue Resolution Procedure displayed on site?
-
25. Is there a SDS (Safety Data Sheet) register on site and is it up to date?
Communication & Consultation
-
26. Are daily pre-start meetings being undertaken?
-
27. Are regular tool box talks been undertaken and documented?
Emergency Prepardness
-
28. Is there an emergency evacuation plan or procedure in place and is it displayed?
-
29. Has an emergency procedure drill been carried out?
Managing Incidents
-
30. Have any incidents occurred on site and have they been documented?
-
31. Is Document SMS-03-02 - Incident Procedure displayed on site?
-
32. Are previous audits and inspections kept on site in the Site Safety Pack?
-
33. Have RAP's issued as a result of audits or inspections been closed out?
RAP: Desktop Audit
-
Add number of RAP issues required
RAP
-
Enter Detailed RAP information
-
Enter correction date
Site Audit
Site Audit - Walk Around
-
Please provide evidence for site audit - Take Photos
First Aid
-
34. Is there a person responsible for first aid on site and are there details displayed?
-
35. Is the person responsible for first aid appropriately trained?
-
36. Are there sufficient first aid kits in the workplace and are the contents in date?
-
37. Is there a sharps kit available?
Amenities
-
38. Are there toilets available?
-
39. Are amenities available and are they clean?
-
40. Are hand washing facilities and clean drinking water available?
Electrical
-
41. Is electrical equipment tested and tagged?
-
42. Is site shed protected by RCD?
Fire Protection
-
43. Are there fire extinguishers on site and are they accessible?
-
44. Are inspections and test dates up to date? (Every 6 months)
-
45. Is the equipment appropriately marked?
Hazardous Chemical
-
46. Have all hazardous chemicals been identified, labelled and stored correctly?
-
47. Have risk assessments been completed where high or extreme hazardous chemicals exist?
-
48. Is storage area clean, tidy and appropriately ventilated?
-
49. Is there a spills kit available?
Lifting Equipment
-
50. Has all lifting equipment on site been inspected for testing and tagging?
-
51. Is there a register on site and has it been filled in correctly?
Signage
-
52. Are the mandatory signs in place? i.e. SDS / first aid / Fire extinguisher / hazardous chemicals?
-
53. Is the entry sign as per section 4 of the Construction Safety Plan in place?
-
54. Is there appropriate signage for the size of site indicating and advising unauthorised entry and use of appropriate PPE?
Trenching & Excavating
-
55. Are trenches benched, shored, battered or certified as per the regulations?
-
56. Are there adequate access ladders provided along the length of the trench?
-
57. Has an excavation permit been completed?
-
58. Is there appropriate access and egress points?
General Site Observation
-
59. Is mandatory PPE been used?
-
60. Are warning lights and reversing beepers operating?
-
61. Are daily pre-start checks been conducted on machinery and plant?
-
62. Are safety pins on excavators inserted?
-
63. Are barricades correctly erected around work areas?
-
64. Are safety caps on star pickets?
Worker Observation
-
Select any worker/subcontractor on site and ask the following
-
65. Is the worker aware of the emergency plan?
-
66. Is the worker aware of the first aid on site?
-
67. Can the worker identify the first aider on site?
-
68. Can the worker identify the communication channel for site?
-
69. Can the worker provide details of items in the site induction?
RAP: Site Audit
-
Add number of RAP issues required
RAP
-
Enter detailed RAP information
-
Enter correction date
Submission
Additional Information
-
This section is to add additional information about the Audit if needed
-
Additional comments
-
Add Additional Photos
-
Additional RAP issues required
RAP
-
Enter detailed RAP information
-
Enter correction date
Sign Off
-
Enter Date & Time
-
Please enter name and sign here
Final Submission
-
Once then Audit has been complete please click finish below. You will need to then export (Send) the audit to safety@shadcivil.com.au in PDF and CSV format.