Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

SYSTEM

EMS Implementation

  • Is there a construction environmental management plan (CEMP) on site?

  • Has the CEMP been signed by the project manager?

  • Has the CEMP been fully implemented and relevant forms filled out?

  • Is there an Environmental policy displayed on site?

  • Is the Erosion and Sediment Control Plan displayed on site?

Inductions

  • Has the site specific induction been updated to include environmental?

  • Have the environmental risks for the project been identified?

SITE

Initial Site Inspection

  • Has the ESCP approved for the site?

  • Have all necessary development approvals been obtained?

  • Are site conditions consistent with those assumed within the approved ESCP?

Environmental Forms

  • Are the following environmental forms being filled out at appropriate times and intervals?

  • Weekly environmental inspection checklists

  • Daily environmental conditions

  • Water quality monitoring form

  • Dust monitoring

  • Noise monitoring

Site Establishment

  • Site access is controlled and number of access points minimised?

  • Adequate drainage and sediment controls exist at site entry/ exit points?

  • Adequate drainage, erosion and sediment controls have been placed around the site compound?

  • Office compound area and car park gravelled/ stabilised where necessary to control erosion and mud generation?

  • Appropriate drainage and sediment controls are installed prior to new areas being cleared or disturbed?

  • Is there a rain gauge on site?

Site and Vegetation Management

  • ESC measures have been installed in accordance with the approved installation sequence?

  • Adequate supplies of ESC materials stored on site: such as straw bales, wire, stakes, sediment fence fabric, filter cloth, flocculant etc?

  • Are temporary access roads are stabilised where appropriate?

  • Permanent access roads programmed to be sealed as soon as reasonable and practical?

  • Sediment deposition is not observed on external roads?

  • Site is adequately prepared for the anticipated weather?

  • Adequate protection provided for non disturbance areas, buffer zones, protected trees?

Material and Waste Management

  • Chemical and petroleum products appropriately stored on site?

  • Emergency spill response plan has been prepared for the site?

  • Oil/petroleum spill containment/ response kits available on site where appropriate?

  • Is the site clean and clear of litter build up?

  • Is there separate waste and recycling bin on site?

  • Is waste water from construction activities being captured on site and treated appropriately?

Stockpiles

  • Topsoil with a 100-300mm layer?

  • Are stockpiles 20 meters away from water bodies?

  • Are stockpiles stabilised 70% cover with vegetation or geo textile fabric?

  • Is there a sediment fence at the base of all stockpiles- not too close that it will over flow with sediment?

  • Are the stockpiles positioned in a way that they are away from existing flow paths?

  • If stockpile is not being used within 10 days it is to be stabilised (Hydromulch, Geofabric, or mulch?)

Drainage Controls

  • Are drainage control measures consistent with site ESCP?

  • Is clean and dirty water separated?

  • Have appropriate drainage controls been installed prior to new areas being cleared or disturbed?

Clean Water Drains

  • Are all drains in working order and are adequately maintained?

  • Is upslope clean water being appropriately diverted around/ through the site in a non erosive manner?

  • Does clean water drainage path lead to clean water?

  • Up-slope storm water adequately diverted/ managed?

  • Flow diversion channels/banks stabilised against erosion?

Dirty Water Drains

  • Drains are in working order and are adequately maintained?

  • Drainage lines free of scour and soil deposition?

  • Does dirty water path lead to sediment basin?

  • Flow not unlawfully discharged into an adjacent property?

  • Spacing of cross drainage (e.g catch drains or flow diversion banks) down long slopes is sufficient to prevent rill erosion?

  • Is sediment laden water filtering through sediment traps?

Rock Filter Dams

  • Excessive sediment removed from upslope of all traps?

  • Is flow passing over the dams and not around them?

  • Is the filtration systems free from sediment blockage?

  • Is the rock size appropriate for drain size and flow type?

Erosion Controls

  • Erosion control standard is consistent with requirements of regulatory authority?

  • Soil erosion is being controlled to a standard consistent with the level of environmental risk?

  • Earth batters free of rill erosion?

  • Erosion control measures consistent with the approved ESCP?

  • All erosion controls in working order?

  • Are all erosion control blankets:<br>- Well anchored?<br>- Overlapped in direction of storm water flow?<br>- Not damaged?

  • Mulch has appropriate cover over surface and is working effectively?

  • Is mulch secure and free from movement by wind or water?

Sediment Controls

  • Sediment control standard is consistent with requirements of regulatory authority?

  • Sedimentation is being controlled to a standard consistent with the level of environmental risk?

  • Sediment control is appropriate for the soil type?

  • Sediment control measures are being adequately maintained in proper working order at all times?

Entry / Exit Points

  • Control measures are constructed to appropriate standards?

  • Is rock large enough to not get carried away with vehicles?

  • If shaker grid is installed, is road before and after stabilised with rock for 15 meters?

  • Are entry/ exit pads free of excessive sediment deposition?

  • Excessive sedimentation is not evident on roadway?

Sediment Fences

  • Is bottom of fabric securely buried?

  • Is fabric appropriately overlapped at joints?

  • Is fabric attached to posts?

  • Are sediment fences free of excessive sediment deposition?

  • Are support posts at correct spacing (2m or 3m with backing)?

  • Are sediment fences free of damage?

Sediment Basins

  • Does the basin geometry and layout match design details?

  • Are sediment basins on site flagged off and out of way of public?

  • Is basin adequately sized and calculated to hold run off for the area?

  • Is dewatering being conducted in accordance with best practice?

  • Has excessive sediment been removed from basin?

  • Has a sediment depth marker been installed and maintained?

  • Is the primary outlet structure free from sediment blockage?

  • Is the inlet and outlet appropriately stabilised with rock?

  • Is the settled sediment layer clearly visible through ponded water prior to discharge such water?

  • Do adequate quantities of flocculant (if required) exist on site?

Air Quality

  • Are water trucks on site to control dust and watering down regularly?

  • Are all exposed areas stabilised where possible to minimise dust?

  • On visual inspection, is dust leaving site?

  • Is refuelling occurring as per EMP?

  • Is correct storage of Hazardous materials evident as per EMP?

  • Has there been any dust complaints in the current month? If so, have they been documented and reported to the environmental team?

Noise Control

  • Are times of operation being adhered to and if noisy operation is to occur outside of work hours, nearby residents and the local council are notified?

  • Have all noise levels been adhered to? If a complaint has been made, has it been documented and reported to the environment team?

Water Quality Management

  • Is all water being released off site within the required water quality parameters?

  • Is sediment basin water being documented on EMS-05-12 sediment basin discharging form?

  • If water quality monitoring has been specified as required for the job, is it being undertaken at the correct intervals?

Site Establishment/ Vegetation

  • Is there a site stabilisation plan for the site?

  • Are finished exposed areas being stabilised as soon as works are complete?

  • Are soil surfaces being roughened prior to revegetation?

  • Is erosion being adequately controlled during plant establishment stage?

Flora and Fauna

  • Is vegetation to be cleared been surveyed and adequately marked?

  • If there is protected vegetation on site is it clearly marked and site workers made aware?

  • Are all fauna related activities in the management plan?

SITE SPECIFIC

  • Acid sulphate soils

  • Have acid sulphate soils been identified on site? If no skip this section

  • Is there a acid sulphate management plan for the site?

  • Is all water being treated on site and discharged within the required parameters?

  • Is there an adequate amount of lime on site for treatment of soils?

  • Is the lime register being filled out and being kept up to date?

Cultural Heritage

  • Has this site been identified as containing or potentially containing cultural heritage artefacts? If no, skip this section

  • Have all employees undertaken training to be informed about the presence of Cultural Heritage?

  • Have the local tribe members been contacted?

  • If artifcats have been found, has the artefact register been filled out?

Worker observation- Select any worker/ subcontractor on site and ask the following

  • Is the worker aware of the Construction Environmental Management Plan?

  • Is the worker aware of the Erosion and Sediment Control Plan?

  • Does the worker know where the environmental policy is located?

  • If there is any site specific environmental requirements is the worker aware of these?

  • Can the worker provide details of items in the site induction?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.