Title Page

  • Audit Title

  • Document No.

  • Contract

  • Total Eden

  • Observer

  • Conducted on

Time on Site

  • Arrive

  • Depart

Audit Location

  • Location

  • Chainage Start

  • Chainage End

Remediation & Rehabilitation

  • Has the top soil be reinstated correctly?

  • Is the reinstated surface free of excess rocks?

  • Has re-seeding of topsoil been completed? (Unless otherwise agreed with landowner)

  • Have weeds been sprayed, particularly if not evident outside the corridor?

  • Have fences been reinstated to satisfactory standard?

  • Have market posts been installed on fence lines, and major changes in direction?

  • Have waterway crossings (including drainage channels) been rehabilitated to a satisfactory standard?

  • Are there appropriate erosion controls in place, particular on steep slopes and around waterways?

Landowner

  • Has the remediation & rehabilitation been completed to the landowner's satisfaction?

  • Have the landowner's access roads/tracks been remediate to a standard that is equal to, or better than the condition prior to construction?

Sketches

  • Add drawing

Photos

  • Add media

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.