Title Page
-
Audit Title
-
Document No.
-
Contract
-
Total Eden
Valve Asset Number
Valve Location
-
- Melrose Line
- Main Line
- Main A Spur
- Lagoon Spur
- Springs Spur
- Other
-
Chainage
Completed by
-
Observer
-
Conducted on
Time on Site
-
Arrive
-
Depart
-
Cast iron grating lid can be removed?
-
Scour pipe entry is sealed water tight?
-
Joints between pre-cast sections, including lid are sealed water tight?
-
Concrete energy dissipation block installed?
-
Rock pitching installed around pit, and adequately protects against erosion?
-
Excess water can drain away from pit?
-
There is no subsidence around pit?
-
Valve cover is adequately installed?
-
Valve spindle is installed correctly (less than 200mm from surface, or with extension, & centralised?
-
Marker & bollard are securely installed?
-
There is no rubbish in or around pit?
-
Other Issues?
-
Sketches
-
Photos
-
Sign Off