Title Page

  • Audit Title

  • Document No.

  • Contract

  • Total Eden

  • Observer

  • Conducted on

Time on Site

  • Arrive

  • Depart

Chainage

  • General Information

  • Line

  • Chainage

Safety

  • Is there a Safe Work Method Statement (SWMS) in place and on Site?

  • Are minimum on-site safety standards been maintained?

General

  • Is welding operator suitably qualified?

  • Name of Welder

  • If applicable what is the weld number being assessed?

  • Is welder maintaining weld records on a daily basis?

Pipe Quality

  • What is the pipe diameter being installed

  • Is the PN rating being installed correct for the specified chainage?

  • What is the measured wall thickness (mm) of the pipe being welded?

  • Is pipe quality acceptable?

  • Are the pipes clear of damages?

Pipe Clamping

  • Are pipe weld clamps fully engaged?

  • Are pipes fully engaged?

  • Does the pipe wall thickness match?

Pipe Cleaning

  • Has the pipe been cleaned and planed?

  • Have all scratches been removed from the weld surface?

  • Have all potential surface contaminants been cleaned/wiped off the pipes prior to welding?

  • Has the inside of pipe been checked for debris/foreign material and removed?

Pipe Alignment

  • Has the pipe been correctly aligned?

  • Are the alignment of weld surfaces acceptable?

Calculation

  • Does pipe weld calculation meet the necessary standard?

  • Is data input being done correctly?

  • Are pipe weld calculations being performed accurately?

Bead Up

  • Has an external bead formed?

Heat Soak

  • Has heat being applied for the full required time?

  • Heat soak time (minutes)?

Surface Matching

  • Has the heat plate been removed quickly and cleaned?

  • Have heated surfaces been matched immediately?

  • Has the correct matching pressure been attained?

  • Drag (bar)?

  • Weld (bar)?

  • Actual pressure attained (Bar): Total (Drag + Weld)?

Cool Down

  • Has the cooling down period being applied for the full required time?

  • Cool down period (minutes)?

  • Was pressure maintained during cooling down period?

Waste Removal

  • Have off-cuts been removed from inside pipe prior to welding?

  • Have all off-cuts been collected and contained for proper disposal?

Visual Inspection

  • Has the welder inspected the pipe condition and checked tolerances prior to welding?

  • Does the completed weld appear to be aligned and good quality?

  • Have welded ends been covered at the end of each shift?

  • Has the weld number been marked?

Notes

Sketches

  • Add drawing

Photos

  • Add media

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.