Title Page
-
Audit Title
-
Document No.
-
Contract
-
Total Eden
-
Observer
- Mike Penfold
- Brock Nadler
- Other
- Hayden Allwright
-
Conducted on
Time on Site
-
Arrive
-
Depart
Chainage
-
General Information
-
Line
-
Chainage
Safety
-
Is there a Safe Work Method Statement (SWMS) in place and on Site?
-
Are minimum on-site safety standards been maintained?
General
-
Is welding operator suitably qualified?
-
Name of Welder
-
If applicable what is the weld number being assessed?
-
Is welder maintaining weld records on a daily basis?
Pipe Quality
-
What is the pipe diameter being installed
- 1000mm
- 560mm
- 500mm
- 450mm
- 355mm
- 315mm
- 200mm
- 160mm
- 110mm
- Other
-
Is the PN rating being installed correct for the specified chainage?
-
What is the measured wall thickness (mm) of the pipe being welded?
-
Is pipe quality acceptable?
-
Are the pipes clear of damages?
Pipe Clamping
-
Are pipe weld clamps fully engaged?
-
Are pipes fully engaged?
-
Does the pipe wall thickness match?
Pipe Cleaning
-
Has the pipe been cleaned and planed?
-
Have all scratches been removed from the weld surface?
-
Have all potential surface contaminants been cleaned/wiped off the pipes prior to welding?
-
Has the inside of pipe been checked for debris/foreign material and removed?
Pipe Alignment
-
Has the pipe been correctly aligned?
-
Are the alignment of weld surfaces acceptable?
Calculation
-
Does pipe weld calculation meet the necessary standard?
-
Is data input being done correctly?
-
Are pipe weld calculations being performed accurately?
Bead Up
-
Has an external bead formed?
Heat Soak
-
Has heat being applied for the full required time?
-
Heat soak time (minutes)?
Surface Matching
-
Has the heat plate been removed quickly and cleaned?
-
Have heated surfaces been matched immediately?
-
Has the correct matching pressure been attained?
Cool Down
-
Has the cooling down period being applied for the full required time?
-
Cool down period (minutes)?
-
Was pressure maintained during cooling down period?
Waste Removal
-
Have off-cuts been removed from inside pipe prior to welding?
-
Have all off-cuts been collected and contained for proper disposal?
Visual Inspection
-
Has the welder inspected the pipe condition and checked tolerances prior to welding?
-
Does the completed weld appear to be aligned and good quality?
-
Have welded ends been covered at the end of each shift?
-
Has the weld number been marked?
Notes
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-
Add signature