Audit

Locking bar is easily removed?

Padlock Installed?

Lid of pit is easily removed?

Pit is a minimum of 500mm above the local ground level?

Drainage holes in pit are drilled sufficiently below top of air valve, and at least 100mm above ground level?

Air valve & butterfly/ball valve are operating correctly?

No leaks present?

Riser bolted flanges are dense wrapped if below ground?

Clean aggregate in base of pit for drainage?

There is no subsidence around pit?

Excess water can drain away from pit?

Marker & bollard are securely installed?

There is no rubbish in or around pit?

There are no other issues?

Sketches
Add drawing
Photos
Add media
Sign Off
Add signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.