Title Page
General
-
Audit Title
-
Document No.
-
Contract
-
Total Eden
-
Other
Valve Asset Number
Valve location
-
Location
- Melrose Line
- Main Line
- Main A Spur
- Lagoon Spur
- Springs Spur
- Other
-
Chainage
Observer
-
Observer
-
Conducted on
Time on Site
-
Arrive
-
Depart
-
Locking bar is easily removed?
-
Padlock Installed?
-
Lid of pit is easily removed?
-
Pit is a minimum of 500mm above the local ground level?
-
Drainage holes in pit are drilled sufficiently below top of air valve, and at least 100mm above ground level?
-
Air valve & butterfly/ball valve are operating correctly?
-
No leaks present?
-
Riser bolted flanges are dense wrapped if below ground?
-
Clean aggregate in base of pit for drainage?
-
There is no subsidence around pit?
-
Excess water can drain away from pit?
-
Marker & bollard are securely installed?
-
There is no rubbish in or around pit?
-
There are no other issues?
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-
Add signature