Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Systems Hardware
Freezer
Drinks/Salads Coldroom
Chicken Cold Room
Customer Toilets
Staff room, Staff Toilet, Dumpster
BOH - Kitchen, Breading, Drive Thru Pay Point, Scullery, Store room
FOH - Packing, Office, Burgers, Chip Fryers Krushers, Drive thru Pickup and Prep Bench
Indoor Dining
Outdoor dining
Supply Plumbing
Underground Plumbing
Landscaping
-
Irrigation system installed and comissioned
-
Initial watering completed with schedule for establishment watering completed
-
Grasses and other plants as specified
-
Turf installed with consistent levels and no gaps
-
Trees and shurbs as specified and supported if required
-
Mulching as specified and consistent
-
Ground levels as nominated
Security systems
HVAC
General Electrical
Building exterior
-
Front doors
-
Safety decals installed
-
Door buzzer installed and working
-
Obstruction sensor installed and working
-
Sensors installed and working
-
Open button installed and working
-
Brushes/weather strips installed
-
Runs freely on tracks
-
Awning installed over
-
Flashings installed
-
Auto doors installed and commissioned
-
Default locking mode working
-
Frame free from defects and sealed to surrounds
-
Windows free from defects and sealed
-
Flashings installed
-
All service ducting installed and sealed to building
-
Drive thru window 2
-
Open button installed and working
-
Brushes/weather strips installed
-
Runs freely on tracks
-
Awning installed over
-
Flashings around window
-
Auto window installed and commissioned
-
Default locking mode working
-
Frame free from defects and sealed to surrounds
-
Drive thru window 1
-
Open button installed and working
-
Brushes/weather strips installed
-
Runs freely on tracks
-
Awning installed over
-
Flashings around window
-
Auto window installed and commissioned
-
Default locking mode working
-
Frame free from defects and sealed to surrounds
-
External enclosure installed as nominated
-
Bump rails/bollards installed
-
Gate secure and operational
-
Equipment Installed securely
-
Roller door installed as nominated
-
Look engages with catch
-
Flashings installed
-
Door stops installed
-
Key cylinder swapped to store key
-
Door frame free from defects and sealed to surrounds
-
Brushes/weather strips installed
-
Runs freely on tracks
-
Rear door installed as nominated
-
Brushes/weather strips installed
-
Door frame free from defects and sealed to surrounds
-
Key cylinder swapped to store key
-
Door stops installed
-
Flashings installed
-
Look engages with catch
-
Swings freely with appropriate hinges
-
Peep hole installed
-
Door buzzer installed and functioning
-
Wood feature installed and free from defects
-
Texture applied with uniform appearance
-
Cappings installed and sealed
-
Grease trap installed and connected to trade waste
-
Down pipes installed
-
Connected to storm water
-
Gutters installed and free from defects
-
Connected to down pipes
-
Roof installed and free from defects
-
All wall clad dings installed and free from defects
-
External painting completed as nominated
-
Roof access point installed
General site
-
All required certifications received
-
All other required inspections completed and passed
-
Certificate of classification received
-
Plumbing inspection completed and passed
-
Structural inspection completed and passed
-
Building inspection completed and passed
-
Health inspection completed and passed
-
Equipment removed from site
-
On roof
-
Builders clean completed
-
External dining
-
BOH
-
FOH
-
Internal dining
-
External of building
-
Carpark, walkways and drive thru
-
Materials removed from site
-
On roof
-
Temporary fencing removed
-
Shipping containers removed
-
Site office removed
Signage
-
Drive Thru window placards installed and correct
-
Mural 5 correct and installed
-
Edges fit, straight and neat
-
No bubbles in graphic
-
Mural 4 correct and installed
-
Edges fit, straight and neat
-
No bubbles in graphic
-
Mural 3 correct and installed
-
Edges fit, straight and neat
-
No bubbles in graphic
-
Mural 2 correct and installed
-
Edges fit, straight and neat
-
No bubbles in graphic
-
Mural 1 correct and installed
-
Edges fit, straight and neat
-
No bubbles in graphic
-
Krushbar blade installed
-
Krushers sticker installed
-
Graphic correct and installed
-
Krushbar sneeze guard installed
-
Graphic correct and applied
-
Trading hour decals correct and installed
-
Building signage installed and commissioned
-
Pylon/bucket/blade installed and commissioned
-
Direction signage installed and commissioned
-
Height bar installed and commissioned
-
Height bar labelled with correct clearance height
Carpark and Drive Thru
-
Concrete painted as nominated
-
Walkways installed to code
-
Bike rack installed
-
Speed bumps installed as nominated
-
Tactiles installed as nominated
-
Storm drainage is installed as nominated and connected
-
Fencing installed as nominated
-
Carpark lights installed and commissioned
-
Traffic signs installed as nominated
-
Speaker bollard installed and connections available
-
Rear panel affixed properly
-
Footing connection grouted
-
Drive thru loops installed and connections available
-
Cuts for loop sealed
-
Menu boards installed in position
-
Electrical connection commissioned
-
Footing connection is grouted
-
In correct location
-
Drive thru awning installed and free from defects
-
Electrical connection commissioned
-
Footing connection grouted
-
Curbing completed and free from defects
-
Line marking completed to relevant code and drawings
-
Bollards installed and free from defects
-
Car park stops installed and free from defects
-
Payment completed and free of defects