Title Page
-
Site conducted
-
Quality Control Check Name
-
Conducted on
-
Location
-
Account used
-
Elevations
-
Elevation
-
Floor Level
- Level 01
- Level 02
- Level 03
- Level 5
- Level 6
- Level 7
-
Section(s) & Level
- Section 1
- Section 2
- Section 3
- Section 4
- Section 5
- Section 6
- Section 7
- Section 8
Aluminium Flashings & Vulcalap Planks
-
Have the Vulcalap Planks been installed with central fixed point and sliding point clips
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the Planks / Flashing defect damage free?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
Completion
-
Are there any other notes relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Are there any other photos relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Sign below to confirm that questions above have been answered truthfully and with all relevant due diligence having been carried out. Please include the person's name.
-
Russell Roofing Signature