Title Page

  • Document No.

  • Project Name

  • Job Number

  • Conducted on

  • Prepared by

  • Location

Demobilization

  • What type of project is this?

Roof Deck

  • All of the leaks and drips are cleaned up?

  • Is there material left onsite?

  • What material is left onsite?

  • How many truckloads of EPS?

  • Notes

  • Take a picture of the properly stored material.

  • How many truckloads of Tectum?

  • Notes

  • Take a picture of the properly stored material.

  • How many bags of roof gyp?

  • Notes

  • Take a picture of the properly stored material.

  • How many sheets of Securock/Dens Glass?

  • Notes

  • Take a picture of the properly stored material.

  • How many rolls of Peel & Stick?

  • Notes

  • Take a picture of the properly stored material.

  • Will a return trip be needed to complete our scope of work?

Floor

  • All of the leaks and drips are cleaned up?

  • Is there material left onsite?

  • What material is left onsite?

  • Add for each different type of bagged material

  • Bags
  • What bagged product?

  • How many bags?

  • Notes

  • Take a picture of the properly stored material.

  • Add for each different type of sound mat

  • Rolls
  • What sound mat product?

  • How many rolls of sound mat?

  • Notes

  • Take a picture of the properly stored material.

  • How many sheets of mesh?

  • Notes

  • Take a picture of the properly stored material.

  • How many sheets/pieces of EPS?

  • Notes

  • Take a picture of the properly stored material.

  • Will a return trip be needed to complete our scope of work?

Door

  • Was Owner training completed?

  • Will a return trip be needed to complete our scope of work?

  • Did you take final dimensions after track installation?

Iron Work

  • Is there material left onsite?

  • What material was left onsite?

  • How many Bulb Tees?

  • Notes

  • Take a picture of the properly stored material.

  • How many sheets of metal deck?

  • Notes

  • Take a picture of the properly stored material.

  • Will a return trip be needed to complete our scope of work?

  • Is all the trash picked up?

  • Are all of WFP's tools and safety equipment picked up and accounted for?

  • Did you notify the General Contractor that our work is complete?

  • Did the GC superintendent participate in a walk-through of our completed work?

  • GC Superintendent Signature

  • Is there rental equipment onsite?

  • Is they equipment parked and ready for pickup or will you return it to the rental company?

  • Take pictures of your completed work prior to leaving

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.