Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
All temporary toilets comply with the Guidelines of the Suruhanjaya Pengurusan Air Negara (SPAN) or Ministry of Health.
-
No sullage or sewage effluent discharged into sediment pond or directly into any rivers or public area before it is adequately treated.
-
Septic tank installed and maintained throughout usage.
-
Septic tank properly removed or closed after demobilization
-
Septic tank shall be desludged at least 6 months once depending on the number of workers at the site.
-
A proper waste disposal system implemented at all workers quarters.
-
Proper dustbins with lids provided at suitable locations with adequate numbers for effective housekeeping.
-
Workers quarters isolated from construction site and located away from residential areas as far as practicable.
-
Proper drainage around workers quarters maintained to avoid any stagnant water that will create unhygienic conditions on site.
-
Workers quarters shall be kept tidy.
-
Workers quarters free of mosquitos breeding spots.
-
The following information/ posters should be displayed at all workers quarters notice boards:<br>• Emergency communication flow chart complete with telephone numbers of responsible key personnel<br>• DOE’s zero burning posters<br>
-
Grease trap provided and maintained for canteen
-
Sufficient fire extinguisher at canteen and sleeping quarters (As far as practicable)
-
Cooking gas cylinders to be stored at cooking area not at sleeping quarters
-
Maximum 4-6 people per cabin
-
If there is a gen-set (ensure location is far, no flammable materials nearby, no other materials to be stored, sufficient warning safety signange)
-
Electrical wiring / DB at cabins in good condition
-
Workers to hang clothes at proper area
-
Add signature