Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
Planning
-
Is PTW system in place?
-
Is the Confined Space Entry (CSE) certificate attached with the PTW? (if applicable)
-
Is the person in-charge of the excavation work well trained?
-
Is daily inspection of excavation site conducted by the Superintendent Officer (SO) and Work Supervisor (WS) to ensure no change in conditions before the start of work.
-
Are proper PPE being used?
-
Are high visibility clothing provided and worn by all workers exposed to public flow?
-
Flagman / Traffic Controller available near the excavation area?
-
Has the local utility agency/companies contacted as part of the work plan (if necessary) eg: TNB, SYABAS, TELEKOM?
-
Has exact location of utilities been identified and marked in the plan?
-
Are underground installations protected, supported, or removed when excavation is open?
-
Are protective or shoring systems designed by a Profesional Engineer (PE)?
Execution and Monitoring
-
Are protective or shoring systems installed to protect workers from hazards of cave-ins, collapses, or struck by materials or equipment?
-
Has atmosphere within the excavation tested for oxygen deficiency, combustible or other harmful contaminant?
-
Are ladders, stairways or ramps used in excavations secured and extended 1.2 meter above the edge of the trench? Are they installed in sufficient number?
-
Are hard barriers / barricade and hazard lights (at night) provided for excavation sites in public areas to prevent fall?
-
Are the open sides of excavations guarded by adequate barricades and suitable warning signs put up at visible positions at least 0.7 meter from the edge of the excavation?
-
Are the de-watering and de-silting facilities provided to prevent floods and pollution of the drainage system and surrounding areas?
-
Is there any an approval of the road controlling authority before any work starts on a road or highways (Traffic Management Plan, TMP)?
-
Is surface water runoff diverted or controlled to prevent accumulation in the excavation?
-
Are rescue equipment, such as breathing apparatus, safety harness and lifeline, and/or basket stretcher readily available where hazardous atmospheres could or do exist?
-
Are standby or rescue personnel trained to use these rescue equipment?
-
No workers are allowed in the trench during back filling
-
Has the excavated materials and superimposed load placed at least 2 feet or 0.6 metres from the edge of open excavation and trenches?
-