Administration and Organization
-
For specialised scaffoldings (e.g Hung/Suspended, load bearing, tubular above 40 meter). Designed and approved by competent person or Professional Engineer and drawing must be made available.
-
Levels of competency of workers meet DOSH requirements. (eg. Level 2 or advanced scaffolder)
-
Are inspection tags available and periodically revalidated (weekly or other specified interval)?
-
Is the scaffold inspected by a competent scaffold inspector?
-
There is a minimum high power line (415 kV) clearance of 10 feet from the scaffold
Scaffold Structure & Working platform
-
If the scaffold is defective, has it been removed from service and tagged out
-
Footing are level, sound, and rigid. No settling has occured
-
Are proper sole plates used for uneven surfaces? e.g. soft soil, grating?
-
Are barricade and warning signs installed to protect against moving vehicles and objects?
-
Are the tubes, fitting and floorboards free from signs of damage or deterioration e.g. rusting, sufficient thickness, not split, rotten?
-
Are the working platforms free from obstruction, loose objects, debris and tripping hazards?
-
Are floorboards adequately secured and with a minimum width of 635 mm (2 feet)?
-
Are guardrails fitted and connected up to standards (i.e. height to top of guardrails is between 0.9 and 1.1 metres.)?
-
Is toe board installed at the working platform level?
Access and Egress
-
Is there a safe access and egress to working platforms?
-
Is barricade chain or hand rails available at working platform?
-
Cross braces are not bended / damaged
-
Hook -on and attachable ladder are fixed securely and in good condition
Supporting Structure & Anchoring Points (e.g. structures where scaffoldings are secured or anchored to)
-
Are supporting structures / equipment (e.g. outriggers) adequate to support scaffolding?
-
Unsuitable equipments e.g. pipings, cable trays etc are not used as supporting structure
-
Is the structure covered with proper netting? (optional)
-