Information
-
Conducted on
-
EH&S Committee Member/s
-
Project Name
-
Project Number
-
Project Address
-
Project Manager
-
Site Manager
-
Percentage of completion (%)
Scoring Information
-
Rating Scale Compliance
0 Unacceptable 0-25% Immediate action required/ Major non-compliance
1 Poor 25% Attention required before the end of the day
2 Fair 50% Attention required within the next 2 days
3 Acceptable 75% Minimal rectification required
4 Good 100% No action required
Based on:
0 Potential for serious injury/ major damage to equipment
1 Likelihood for an incident occurring
2 General non-compliance with legal or site safety requirements
3 Compliance substantial but not 100%
4 All areas satisfy both legal and site safety requirements
Not applicable:
* - Not Applicable - To be placed in appropriate section when not being audited
Audit Target
80% + -
All actions arising out this audit are to be entered into the Byte Construct Action Tracking Register BYT-IMS-8.73
-
Is this the first Audit for this site?
-
Have all actions from the previous Audit been closed and evidence provided
-
1. Site Risk Assessment Form Available?
-
Is there evidence that the Risk Register has been updated by the Site Manager?
-
2. Byte PMP has been signed and available onsite?
-
3. Is there a Traffic Management Plan established and implemented on the site?
-
3. Construction Site Signage clearly displayed at all entrances?
-
4. Site contact details are clearly displayed?
-
3. Site Diary used via Procore
-
Is a paper-based Site Diary used and maintained?
-
4. Safe Access and Egress (to and from Site and Work Areas)
-
6. Check protective measures:
-
7. Safe provision for public rights of way - no part of the construction zone is impacting public areas
-
8. Protection to building tenants (if applicable) - their roads and footpaths, and internal paths of travel
-
Passageways, walkways and access ways clear of building material
-
9. Is there a site Site specific Emergency Evacuation plan?
-
Has the Emergency Plan been provided by Byte Construct?
-
Has the Emergency Plan been provided by the Client or Building Manager?
-
10. Daily Register of all contractors on site. Signing IN/OUT - Sign On Site is acceptable
-
11. Site Induction carried out for all contractors and visitors onsite?
-
Are inductions recorded via Sign On Site and approved by the Site Manager
-
Are inductions recorded on a paper-based induction form?
-
12. Have all contractors onsite completed and hold a current Byte Online induction? Complete sample check with Altora.
-
13. Is a Client-specific induction required for this site?
-
Do workers onsite hold a current Client induction?
-
14. Injury Register completed for all accidents - copy forwarded to Byte Construct and recorded on the Central Register
-
Have all actions from incidents closed out and evidence available?
-
15. Toolbox Meetings - evidence/records of having them conducted
-
16. Evidence of Weekly Site Safety Inspection? Hard copy or Procore acceptable
-
17. Safe Work Method Statements from Sub-Contractors and approved by Byte Construct
-
18. Contractors have reviewed and signed SWMS
-
19. Hazardous Substances Register for all hazardous substances on site
-
20. MSDS Register - Material Safety Data Sheets available for all corresponding Hazardous Materials
-
Are MSDS sheets available for all hazardous substance? Soft copies are accepted.
-
Are MSDS in date i.e. no older than 5 years from date of issue?
-
Are Chemical risk assessments available?
-
21. Suitable Storage for Hazardous Substances available?
-
22. Plant - sample check Byte Construct and Subcontractor's plant (includes hired plant). Evidence of plant - maintenance records / log book / operating instructions
-
Have plant risk assessments been provided and copies stored?
-
23. Sample Check Certificates of Conformance for - scaffolds, hoists, chutes, cranes, concrete pumps, loading platforms, load shifting plant.
-
24. Site Safety Rules and Signs (SITE SPECIFIC)
-
25. Site First Aid Officer nominated and contact details displayed?
-
26. Byte Construct Policies readily available and displayed?
-
27. Fire Prevention ie. Extinguisher/s, Base Building services and general housekeeping
-
28. Lighting is adequate to conduct work safely
-
29. Storage of Building Materials - leads tidy, nothing to trip over or get caught on
-
30. Amenities are adequate - Toilets, Lunch Room, Water, Shaded and cool areas
-
Are toilets clean?
-
Is the microwave, fridge and other facilities clean?
-
-
31. First Aid Kit/s on site and fully stocked
-
Saline solution in date?
-
32. Sample Check - Licensed / ticketed operators with Certificates of Competency required for: scaffolders, riggers, dogmas, crane/hoist, concrete boom, load shifting machines, explosive power tools
-
33. Electrical
-
Do all tools have a current electrical test tag attached?
-
Are all power outlets RCD protected?
-
Are temporary construction power circuits clerarly labelled?
-
Are all temporary power boards lockable, have insulated tiebars and have a current test certificate attached?
-
34. Pemit to work Client or Byte Permits forms are acceptable.
-
Hot Works conducted onsite?
-
Flashback arrestors fitted
-
Area around hot works clear of combustible material
-
A fire extinguisher is readily available in the work are?
-
Does Angle Grinder have handle and guard?
-
Penetrations/Concrete Cutting/Coring performed onsite?
-
Has a services report been obtained for coring/cutting/penetrations?
-
If services have been identified, have appropriate isolations been completed and documented?
-
35. Personal Protective Equipment is worn as required by signage or work method.
-
Hard hats worn?
-
Steel cap safety boots worn?
-
Eye protection worn?
-
Gloves available and task specific?
-
Hi-visibility clothing worn
-
Long Pants and Long shirt worn (if a client requirement)
-
36. Is there Visitor PPE available onsite? A minimum of two sets are required unless stated differently in the contract?
-
37. Falling Object Protection: eg Hardhats, barricades, kick boards, O/H Protection, lanyards for tools
-
38. Working at Height above 2m:
-
Scaffold or Fall Arrest System
-
Not within 4.0m of Live Wires
-
1m high Guardrails for drops >2.0m
-
39. Scaffolding over 4m?
-
Scaffold has been errected by a licenced scaffolder?
-
A current Scafftag is attached at all entry points no older than 30 days?
-
40. Raised Access Flooring:<br> - Are open floor areas barricaded off?
-
41. Excavations and Penetrations are:<br> - Securely covered or barricaded <br> - <1.5m deep shored or battered
-
42. Mobile Scissor / Booms operated onsite?
-
Are logbooks completed for all equipment?
-
Is the work platform clean and free od debris?
-
Are barricades erected around the work area?
-
Elevated Work Platform required if reach is over 11 metres?
-
Safety Harnesses worn by all operators?
-
Operators hold a HRWL for WP?
-
Is the logbook filled out when in use?
-
Is the work area barricaded/ a dropzone established
-
43. Ladders in good condition and used correctly. Random Site Check - record details
-
Are ladders maintained in good condition?
-
Are all step ladders auto locking and/or platform ladders?
-
Are step ladders being used for the appropriate work tasks being carried out (i.e. electrical work)
-
Has there been a documented ladder inspection checklist during the last 30 days?
-
Fibreglass or composite materials used for electrical work? (No Aluminium ladders permitted)
-
44. Dust Suppression / Removal devices, isolation of work area and good housekeeping are in place when Hazardous Dust (Silica, MDF) is generated. High Traffic Areas, Water and personnel available to control dust
-
45. Noise areas identified and hearing protection worn when required
-
46. Safety audit of sub-contractor - Are workers performing works in accordance to SWMS.
Environmental
-
47. Environmental Issues - Water Runoff / Soil Erosion<br> - Sediment control plan developed, implemented
-
Is a spill kit available onsite?
-
Are all the contents of the spill kit in serviceable condition?
-
48. Environmental Issues - Waste<br>
-
Waste bins available, Management areas tidy
-
Waste is segregated into different waste streams where possible
-
49. Environmental Issue - Concrete Washout Areas<br> - CWOA established<br> - Washout area in tidy condition
-
Painting - Are suitable paint washing areas provided or is excess paint removed from site?
-
50. Trafficable Areas - clear access for site deliveries, loading dock areas identified and safe
Quality
-
51. Procore daily Site Diary has attendances listed by name i.e. no "unknowns" recorded?
-
52. Is there a record of regular site meetings with minutes stored and readily available onsite?
-
53. Are minutes of PCG meetings stored and readily accessible? - Procore records are acceptable.
- Yes
- No
- N/A
-
54. Are Construction issued drawings available onsite?
- Yes
- No
- N/A
-
Are drawings printed?
-
Are drawings available via Procore?
-
Are drawings available the latest revision?
-
55. Is there a Safety in design report available from the client?
- Yes
- No
- N/A
-
56. Is there an RFI register available?
-
Are RFIs maintained and register up to date?
-
57. Are ITPs required to be established?
-
Are ITPs regularly completed and records kept in the Project File?
-
Is a building licence displayed where required?
-
Any other items / Comments / Summary
Additional comments
-
Actions arising from non-conformities have been issued to the Site Manage for action.
-
Select date