ESCP available and approved by competent person (Professional Engineer / CPESC)
-
Silt Trap/ Detention Pond located at the lowest level
-
ESCP constructed as per approved drawings
-
Sizing / design as per approved ESCP
-
All ESCP components as per the drawings are installed
-
Detention pond / silt trap properly maintained
-
Detention Pond / Silt trap desilted when reaching 50% capacity
-
Geotextile used for gabions and silt traps in good conditions
-
Perimeter earth drain constructed along the Project boundary
-
Slopes properly compacted
-
Slopes are turfed or provided with plastic sheets
-
Earth stockpiled protected by plastic sheets
-
Plastic sheets properly installed
-
Silt fence properly installed
-
Wash trough / wheel washing facilities provided at exit points
-
Water browser deployed
-
Drainage system cleared of sedimentation
-
Drainage system cleared of water ponding
-
Sewage and sullage discharge not channel directly to silt trap / sediment pond without undergoing any treatment
-
Proper installation of check dams
-
Water discharged within permissible limit
-
ESCP components are inspected after every rainstorm
-