Title Page
-
Document No.
-
DF Developments Principal Contractor Compliance Inspection
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Items to be checked
-
No public safety hazards evident when entering site
-
Vehicle movement from site does not interfere with other road users
-
Site identification and safety signage in place
-
Site adequately fenced to prevent unauthorised access
-
Site office clearly marked and identified
-
First aid facilities in place with first aider nominated
-
Emergency procedures in place with evacuation plan displayed
-
General purpose fire extinguisher in place in site office
-
OHS policies, site rules and alerts displayed
-
Site induction register current and available for inspection
-
Incident/injury register current and available for inspection. Note: take note of any reported incidents since previous inspection
-
Have safety inspections been regularly conducted and are they available for inspection
-
Plant and equipment register is current and available for inspection
-
SWMS register current and available for inspection
-
Toolbox talks are being conducted with register available for inspection
-
Hazardous substances register available for inspection
-
Material safety data sheets are available for inspection
-
Plant reverse beepers / lights operational
-
Electrical hazards being managed with RCD's fitted to all switchboards
-
Trenching shored and barricaded where applicable
-
Spoil and rocks located at a safe distance from trenching operations
-
Environmental controls in place
-
Mud not being tracked off site onto external roads
-
Traffic management being adequately managed
-
Hi Vis clothing being worn by all workers
-
Hard hats being worn where applicable
-
Penetrations and pits covered and secured
-
Reinforcing/starter bars and star pickets protected with caps
-
List any other identified issues
-
Add signature
-