iAuditor Mobile App Preview

Inspection

This SPCC plan template for tier 1 qualified facility is based on this link from USEPA.
https://www.epa.gov/sites/production/files/2014-05/documents/tier1template.pdf

Table G-18 Dike Drainage Log

+ Dike Drainage

Dike Drainage
Date and Time

Bypass valve sealed closed?

Rainwater inspected to be sure no oil (or sheen) is visible

Open bypass valve and reseal it following drainage

Drainage activity supervised

Observations and Recommendations

Photo (optional)
Name and Signature of Inspector

Dike Drainage Log Template - SPCC Tier 1 Attachment 3.3 Checklist

Created by: SafetyCulture Staff | Industry: General | Downloads: 6

This dike drainage log template can help fulfill the requirements of SPCC Plan Template - Tier 1 facilities Onshore Facilities (excluding production) and Onshore Oil Production Facilities (excluding drilling and workover facilities).

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Inspection

This SPCC plan template for tier 1 qualified facility is based on this link from USEPA.
https://www.epa.gov/sites/production/files/2014-05/documents/tier1template.pdf

Table G-18 Dike Drainage Log

+ Dike Drainage

Dike Drainage
Date and Time

Bypass valve sealed closed?

Rainwater inspected to be sure no oil (or sheen) is visible

Open bypass valve and reseal it following drainage

Drainage activity supervised

Observations and Recommendations

Photo (optional)
Name and Signature of Inspector