Dike Drainage Log Template - SPCC Tier 1 Attachment 3.3
This dike drainage log template can help fulfill the requirements of SPCC Plan Template - Tier 1 facilities Onshore Facilities (excluding production) and Onshore Oil Production Facilities (excluding drilling and workover facilities).
Scan this QR code to use this paper checklist on your smartphone or tablet or
visit
https://safetyculture.com/
Title Page
Site
Inspected by
Conducted on
Location
This SPCC plan template for tier 1 qualified facility is based on this link from USEPA. https://www.epa.gov/sites/production/files/2014-05/documents/tier1template.pdf
Table G-18 Dike Drainage Log
+ Dike Drainage
Dike Drainage
Date and Time
Bypass valve sealed closed?
Rainwater inspected to be sure no oil (or sheen) is visible
Open bypass valve and reseal it following drainage
Drainage activity supervised
Observations and Recommendations
Photo (optional)
Name and Signature of Inspector
SafetyCulture Staff
Dike Drainage Log Template - SPCC Tier 1 Attachment 3.3
This dike drainage log template can help fulfill the requirements of SPCC Plan Template - Tier 1 facilities Onshore Facilities (excluding production) and Onshore Oil Production Facilities (excluding drilling and workover facilities).
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions.
The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction.
You should independently determine whether the template is suitable for your circumstances.